Investigating the Human Errors in 4D BIM Construction Scheduling

被引:0
|
作者
Kandregula, Shravan Kumar [1 ]
Le, Tuyen [1 ]
机构
[1] Clemson Univ, Glenn Dept Civil Engn Construct Engn & Management, Clemson, SC 29634 USA
关键词
Building Information Modeling; BIM; 4D-BIM; 4D-Visualization; 4D-Scheduling; Construction Scheduling; Scheduling; Construction Planning and Scheduling; Human Errors; Human Error Taxonomy (HET); Cognition error theories;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Four-dimensional building information modeling (4D-BIM or 4D scheduling) is well known to benefit the construction industry in many ways. 4D-BIM is an effective scheduling technique which integrates traditional scheduling methods and advanced visualization of the construction sequences in a 3D environment. Despite the potential benefits of 4D-BIM to improve scheduling quality, errors still often occur in construction schedules. The objective of this research is to understand the association between human errors and computer-aided scheduling. This paper focuses on examining the current practices of 4D-scheduling to gain insights on potential errors during the process of scheduling. Furthermore, the paper discusses a set of root causes of scheduling errors based on different types of human errors in cognition error theories. The research determined human errors through an integrated approach of literature review and a survey. The results of this study are expected to provide new knowledge about what human errors that commonly occur during the scheduling processing using BIM and their root causes.
引用
收藏
页码:750 / 757
页数:8
相关论文
共 50 条
  • [41] Integrated EDM and 4D BIM-Based Decision Support System for Construction Projects Control
    Ayman, Hassan Mohamed
    Mahfouz, Sameh Youssef
    Alhady, Ahmed
    BUILDINGS, 2022, 12 (03)
  • [42] 4D BIM integrated optimization of construction steel bar procurement plan for limited storage capacity
    Khondoker, Md. Tareq Hossain
    Hossain, Md. Mehrab
    Saha, Ayan
    CONSTRUCTION INNOVATION-ENGLAND, 2024,
  • [43] RESEARCH ON BIM-BASED 4D SIMULATION CONSTRUCTION MANAGEMENT OF SUBWAY STATION WITH PBA METHOD
    Wang, Liang
    He, Shaohui
    Liu, Jun
    Wang, Gang
    CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 45 - 49
  • [44] Acquisition and Consecutive Registration of Photogrammetric Point Clouds for Construction Progress Monitoring Using a 4D BIM
    Tuttas, Sebastian
    Braun, Alexander
    Borrmann, Andre
    Stilla, Uwe
    PFG-JOURNAL OF PHOTOGRAMMETRY REMOTE SENSING AND GEOINFORMATION SCIENCE, 2017, 85 (01): : 3 - 15
  • [45] Acquisition and Consecutive Registration of Photogrammetric Point Clouds for Construction Progress Monitoring Using a 4D BIM
    Sebastian Tuttas
    Alexander Braun
    André Borrmann
    Uwe Stilla
    PFG – Journal of Photogrammetry, Remote Sensing and Geoinformation Science, 2017, 85 : 3 - 15
  • [46] A VR training scenario editor for operation in construction based on BIM 4D and domain expert authoring
    Schiavi, Barbara
    Havard, Vincent
    Beddiar, Karim
    Baudry, David
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2023, 12 (05) : 1074 - 1089
  • [47] ON THE USE OF OPEN BIM AND 4D VISUALISATION IN A PREDICTIVE LIFE CYCLE MANAGEMENT SYSTEM FOR CONSTRUCTION WORKS
    Hallberg, Daniel
    Tarandi, Vaino
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2011, 16 : 445 - 465
  • [48] Construction management pull for 4D CAD
    Barrett, P
    CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 977 - 983
  • [49] Modeling construction equipment in 4D simulation
    Amrollahibuki, R.
    Hammad, A.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2018, : 243 - 250
  • [50] 4D CAD - Construction industry perspective
    Webb, RM
    CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 1042 - 1050