Integrated EDM and 4D BIM-Based Decision Support System for Construction Projects Control

被引:9
|
作者
Ayman, Hassan Mohamed [1 ]
Mahfouz, Sameh Youssef [2 ]
Alhady, Ahmed [3 ]
机构
[1] Misr Int Univ MIU, Fac Engn Sci & Art, Dept Architecture, Km 28 Misr Ismailia Rd, Qalubia 13621, Egypt
[2] Arab Acad Sci Technol & Maritime Transport AASTMT, Coll Engn & Technol, Construct & Bldg Engn Dept, B 2401 Smart Village, Giza 12577, Egypt
[3] British Univ Egypt BUE, Fac Engn, Civil Dept, Suez Desert Rd El Sherouk City, Cairo 11837, Egypt
关键词
earned duration management; schedule management; building; information modeling; performance measurement; probabilities; EARNED VALUE MANAGEMENT; PERFORMANCE; INFORMATION; SENSITIVITY; PREDICTION;
D O I
10.3390/buildings12030315
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Project schedule monitoring and controlling are critical challenges of construction project management that are not adequately implemented, likely due to the predominance of earned value management and the lack of utilizing technology, such as BIM tools. Unlike earned value, earned duration management (EDM) was developed, which includes several indices to track schedule progress and measure the performance of a schedule. The goal of this research was to establish a decision support system to track and monitor construction project activities during construction, with better performance and accuracy. A survey was conducted and distributed among ten site engineers, selected from different construction sites. The survey asked the site engineers about the possible durations of certain activities; based on their answers, the authors started the proposed system. In this study, we aimed to develop a decision support system (DSS), which combines BIM with EDM to help calculate probabilistic total project duration, visually detecting critical activities, monitoring visually risky activities subjected to delay and visually categorizing the accuracy of estimated duration for delayed activities.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] An integrated BIM-based approach for cost estimation in construction projects
    Fazeli, Abdulwahed
    Dashti, Mohammad Saleh
    Jalaei, Farzad
    Khanzadi, Mostafa
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (09) : 2828 - 2854
  • [2] DIGITALIZATION AND PROCUREMENT IN CONSTRUCTION PROJECTS: AN INTEGRATED BIM-BASED APPROACH
    Matos, Bruno C.
    Cruz, Carlos O.
    Branco, Fernando B.
    [J]. JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2024, 29
  • [3] Construction planning through 4D BIM-based virtual reality for light steel framing building projects
    Rashidi, Ali
    Yong, Wei Yin
    Maxwell, Duncan
    Fang, Yihai
    [J]. SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2023, 12 (05) : 1153 - 1173
  • [4] Information Modeling for 4D BIM-Based Construction Robot Task Planning and Simulation
    Oyedira, Hafiz
    Turner, William
    Kim, Kyungki
    [J]. CONSTRUCTION RESEARCH CONGRESS 2024: ADVANCED TECHNOLOGIES, AUTOMATION, AND COMPUTER APPLICATIONS IN CONSTRUCTION, 2024, : 816 - 825
  • [5] BIM-Based 4D Simulation to Improve Module Manufacturing Productivity for Sustainable Building Projects
    Lee, Joosung
    Kim, Jaejun
    [J]. SUSTAINABILITY, 2017, 9 (03)
  • [6] BIM-based benchmarking for healthcare construction projects
    Choi, Jiyong
    Leite, Fernanda
    de Oliveira, Daniel P.
    [J]. AUTOMATION IN CONSTRUCTION, 2020, 119
  • [7] BIM-based benchmarking for healthcare construction projects
    Choi, Jiyong
    Leite, Fernanda
    de Oliveira, Daniel P.
    [J]. Automation in Construction, 2020, 119
  • [8] BIM-Based Knowledge Management in Construction Projects
    Wang, Hao
    Meng, Xianhai
    [J]. INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2018, 9 (02) : 20 - 37
  • [9] BIM-Based Management System for Off-Site Construction Projects
    Jang, YeEun
    Son, JeongWook
    Yi, June-Seong
    [J]. APPLIED SCIENCES-BASEL, 2022, 12 (19):
  • [10] RESEARCH ON BIM-BASED 4D SIMULATION CONSTRUCTION MANAGEMENT OF SUBWAY STATION WITH PBA METHOD
    Wang, Liang
    He, Shaohui
    Liu, Jun
    Wang, Gang
    [J]. CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 45 - 49