BIM-Based 4D Simulation to Improve Module Manufacturing Productivity for Sustainable Building Projects

被引:38
|
作者
Lee, Joosung [1 ]
Kim, Jaejun [2 ]
机构
[1] Hanyang Univ, Grad Sch, Dept Architectural Engn, 222 Wangsimri Ro, Seoul 04763, South Korea
[2] Hanyang Univ, Dept Architectural Engn, 222 Wangsimri Ro, Seoul 04763, South Korea
关键词
Building information modeling; 4D simulation; sustainability; operation level 4D model; modular construction; schedule management; material quantity management; quality management; ON-SITE; CONSTRUCTION;
D O I
10.3390/su9030426
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Modular construction methods, where products are manufactured beforehand in a factory and then transported to the site for installation, are becoming increasingly popular for construction projects in many countries as this method facilitates the use of the advanced technologies that support sustainability in building projects. This approach requires dual factory-site process management to be carefully coordinated and the factory module manufacturing process must therefore be managed in a detailed and quantitative manner. However, currently, the limited algorithms available to support this process are based on mathematical methodologies that do not consider the complex mix of equipment, factories, personnel, and materials involved. This paper presents three new building information modeling-based 4D simulation frameworks to manage the three elements-process, quantity, and quality-that determine the productivity of factory module manufacturing. These frameworks leverage the advantages of 4D simulation and provide more precise information than existing conventional documents. By utilizing a 4D model that facilitates the visualization of a wide range of data variables, manufacturers can plan the module manufacturing process in detail and fully understand the material, equipment, and workflow needed to accomplish the manufacturing tasks. Managers can also access information about material quantities for each process and use this information for earned value management, warehousing/storage, fabrication, and assembly planning. By having a 4D view that connects 2D drawing models, manufacturing errors and rework can be minimized and problems such as construction delays, quality lapses, and cost overruns vastly reduced.
引用
收藏
页数:23
相关论文
共 50 条
  • [1] Construction planning through 4D BIM-based virtual reality for light steel framing building projects
    Rashidi, Ali
    Yong, Wei Yin
    Maxwell, Duncan
    Fang, Yihai
    [J]. SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2023, 12 (05) : 1153 - 1173
  • [2] BIM-based 4D mobile crane simulation and onsite operation management
    Tak, Ala Nekouvaght
    Taghaddos, Hosein
    Mousaei, Ali
    Bolourani, Anahita
    Hermann, Ulrich
    [J]. AUTOMATION IN CONSTRUCTION, 2021, 128
  • [3] BIM-Based Research Framework for Sustainable Building Projects: A Strategy for Mitigating BIM Implementation Barriers
    Manzoor, Bilal
    Othman, Idris
    Gardezi, Syed Shujaa Safdar
    Altan, Hasim
    Abdalla, Salem Buhashima
    [J]. APPLIED SCIENCES-BASEL, 2021, 11 (12):
  • [4] Integrated EDM and 4D BIM-Based Decision Support System for Construction Projects Control
    Ayman, Hassan Mohamed
    Mahfouz, Sameh Youssef
    Alhady, Ahmed
    [J]. BUILDINGS, 2022, 12 (03)
  • [5] Information Modeling for 4D BIM-Based Construction Robot Task Planning and Simulation
    Oyedira, Hafiz
    Turner, William
    Kim, Kyungki
    [J]. CONSTRUCTION RESEARCH CONGRESS 2024: ADVANCED TECHNOLOGIES, AUTOMATION, AND COMPUTER APPLICATIONS IN CONSTRUCTION, 2024, : 816 - 825
  • [6] Challenges in construction readiness for BIM-based building projects
    Radzi, Afiqah R.
    Azmi, Nur Farhana
    Kamaruzzaman, Syahrul Nizam
    Algahtany, Mohammed
    Rahman, Rahimi A.
    [J]. JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2024,
  • [7] RESEARCH ON BIM-BASED 4D SIMULATION CONSTRUCTION MANAGEMENT OF SUBWAY STATION WITH PBA METHOD
    Wang, Liang
    He, Shaohui
    Liu, Jun
    Wang, Gang
    [J]. CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 45 - 49
  • [8] Exploring and verifying BIM-based energy simulation for building operations
    Li, Hong Xian
    Ma, Zhiliang
    Liu, Hexu
    Wang, Jun
    Al-Hussein, Mohamed
    Mills, Anthony
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (08) : 1679 - 1702
  • [9] BIM-based iterative tool for sustainable building design: A conceptual framework
    Ahmad, Tayyab
    Aibinu, Ajibade
    Thaheem, Muhammad Jamaluddin
    [J]. INTERNATIONAL HIGH-PERFORMANCE BUILT ENVIRONMENT CONFERENCE - A SUSTAINABLE BUILT ENVIRONMENT CONFERENCE 2016 SERIES (SBE16), IHBE 2016, 2017, 180 : 782 - 792
  • [10] BIM-based Sustainable Building Design Process and Decision-making
    Lim, Yaik-Wah
    [J]. 2017 5TH INTERNATIONAL CONFERENCE ON RESEARCH AND INNOVATION IN INFORMATION SYSTEMS (ICRIIS 2017): SOCIAL TRANSFORMATION THROUGH DATA SCIENCE, 2017,