Investigating the Human Errors in 4D BIM Construction Scheduling

被引:0
|
作者
Kandregula, Shravan Kumar [1 ]
Le, Tuyen [1 ]
机构
[1] Clemson Univ, Glenn Dept Civil Engn Construct Engn & Management, Clemson, SC 29634 USA
关键词
Building Information Modeling; BIM; 4D-BIM; 4D-Visualization; 4D-Scheduling; Construction Scheduling; Scheduling; Construction Planning and Scheduling; Human Errors; Human Error Taxonomy (HET); Cognition error theories;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Four-dimensional building information modeling (4D-BIM or 4D scheduling) is well known to benefit the construction industry in many ways. 4D-BIM is an effective scheduling technique which integrates traditional scheduling methods and advanced visualization of the construction sequences in a 3D environment. Despite the potential benefits of 4D-BIM to improve scheduling quality, errors still often occur in construction schedules. The objective of this research is to understand the association between human errors and computer-aided scheduling. This paper focuses on examining the current practices of 4D-scheduling to gain insights on potential errors during the process of scheduling. Furthermore, the paper discusses a set of root causes of scheduling errors based on different types of human errors in cognition error theories. The research determined human errors through an integrated approach of literature review and a survey. The results of this study are expected to provide new knowledge about what human errors that commonly occur during the scheduling processing using BIM and their root causes.
引用
收藏
页码:750 / 757
页数:8
相关论文
共 50 条
  • [31] 4D BIM and Reality Model-Driven Camera Placement Optimization for Construction Monitoring
    Houng, Seau Chen
    Pal, Aritra
    Lin, Jacob J.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (06)
  • [32] Investigating benefits and criticisms of bim for construction scheduling in SMEs: An Italian case study
    Malacarne G.
    Toller G.
    Marcher C.
    Riedl M.
    Matt D.T.
    2018, WITPress (13) : 139 - 150
  • [33] Development and validation of a framework for preventing and mitigating construction delay using 4D BIM platform in Bangladeshi construction sector
    Assafi, Mohammad Nafe
    Hossain, Md Mehrab
    Chileshe, Nicholas
    Datta, Shuvo Dip
    CONSTRUCTION INNOVATION-ENGLAND, 2023, 23 (05): : 1255 - 1278
  • [34] 4D approach for urban tunnelling in a BIM environment
    Trani, Marco
    Longo, Silvia
    Conti, Monica
    APPLIED GEOMATICS, 2023, 15 (02) : 337 - 347
  • [35] 4D approach for urban tunnelling in a BIM environment
    Marco Trani
    Silvia Longo
    Monica Conti
    Applied Geomatics, 2023, 15 : 337 - 347
  • [36] 4D/BIM model linked to VR technology
    Sampaio, Alcinia Zita
    PROCEEDINGS OF THE VIRTUAL REALITY INTERNATIONAL CONFERENCE - LAVAL VIRTUAL 2017 (ACM VRIC), 2017,
  • [37] BIM4D-based scheduling for assembling and lifting in precast-enabled construction
    Huang, Lihui
    Pradhan, Roshan
    Dutta, Souravik
    Cai, Yiyu
    AUTOMATION IN CONSTRUCTION, 2022, 133
  • [38] SURVEYING THE EXTENT AND USE OF 4D BIM IN THE UK
    Gledson, Barry J.
    Greenwood, David J.
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2016, 21 : 57 - 71
  • [39] Construction Progress Monitoring through the Integration of 4D BIM and SLAM-Based Mapping Devices
    Vassena, Giorgio P. M.
    Perfetti, Luca
    Comai, Sara
    Ventura, Silvia Mastrolembo
    Ciribini, Angelo L. C.
    BUILDINGS, 2023, 13 (10)
  • [40] Cell-Based Transport Path Obstruction Detection Approach for 4D BIM Construction Planning
    Wang, Qiankun
    Guo, Zeng
    Mintah, Kwabena
    Li, Qianyao
    Mei, Tingting
    Li, Peng
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (03)