Using 4D BIM to assess construction risks during the design phase

被引:59
|
作者
Jin, Ziyu [1 ]
Gambatese, John [1 ]
Liu, Ding [1 ]
Dharmapalan, Vineeth [2 ]
机构
[1] Oregon State Univ, Sch Civil & Construct Engn, Corvallis, OR 97331 USA
[2] Univ Texas Austin, Dept Civil Architectural & Environm Engn, Austin, TX 78712 USA
关键词
Risk management; Case study; Building information modelling; Construction planning; Construction safety; SAFETY HAZARD IDENTIFICATION; INFORMATION MODELING BIM; PREVENTION; FRAMEWORK; CHECKING;
D O I
10.1108/ECAM-09-2018-0379
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The prevention through design (PtD) concept has been widely recognized as one of the most effective approaches to eliminate or reduce construction site hazards. It encourages engineers and architects to consider occupational safety and health during the planning and design phases. Nevertheless, the implementation of PtD is often inhibited because designers lack adequate knowledge about construction safety and the construction process, and limited design-for-safety tools and procedures are available for designers to use. The purpose of this paper is to provide designers a tool for assessing construction risks during early phases of multistory building projects at an activity level and on a daily basis in a 4D environment. By using the tool, proactive measures could be taken in the design and planning phase to reduce site hazards. Design/methodology/approach The proposed method consists of four steps including risk quantification at a design element level, 4D model integration with risk values, risk assessment, and design alternative selection and model acceptance. A case study was carried out to test and verify the proposed method. Findings The proposed tool has the capability to assess the safety risk for an entire multistory project and visualize safety risk in a particular time period, work space and task prior to construction. It benefits designers in conducting risk assessments and selecting design alternatives concerning safety. Contractors could also utilize the visualization and simulation results of the 4D model for site safety planning so that a range of risk mitigation strategies could be implemented during construction. Originality/value The study provides an innovative PtD tool targeting designers as primary end-users. The proposed tool helps designers assess construction risks and has potential to incorporate the top levels of the hierarchy of risk controls.
引用
收藏
页码:2637 / 2654
页数:18
相关论文
共 50 条
  • [11] Utilizing 4D BIM Models in the Early Stages of Design
    Oezener, Ozan Oender
    Jeong, Woonseong
    Haliburton, James
    Clayton, Mark J.
    [J]. ECAADE 2010: FUTURE CITIES, 2010, : 89 - 96
  • [12] Bridge construction progress monitoring using lidar and 4D design models
    Puri, Nisha
    Turkan, Yelda
    [J]. AUTOMATION IN CONSTRUCTION, 2020, 109
  • [13] Development and validation of a framework for preventing and mitigating construction delay using 4D BIM platform in Bangladeshi construction sector
    Assafi, Mohammad Nafe
    Hossain, Md Mehrab
    Chileshe, Nicholas
    Datta, Shuvo Dip
    [J]. CONSTRUCTION INNOVATION-ENGLAND, 2023, 23 (05): : 1255 - 1278
  • [14] Acquisition and Consecutive Registration of Photogrammetric Point Clouds for Construction Progress Monitoring Using a 4D BIM
    Sebastian Tuttas
    Alexander Braun
    André Borrmann
    Uwe Stilla
    [J]. PFG – Journal of Photogrammetry, Remote Sensing and Geoinformation Science, 2017, 85 : 3 - 15
  • [15] Acquisition and Consecutive Registration of Photogrammetric Point Clouds for Construction Progress Monitoring Using a 4D BIM
    Tuttas, Sebastian
    Braun, Alexander
    Borrmann, Andre
    Stilla, Uwe
    [J]. PFG-JOURNAL OF PHOTOGRAMMETRY REMOTE SENSING AND GEOINFORMATION SCIENCE, 2017, 85 (01): : 3 - 15
  • [16] Interior construction state recognition with 4D BIM registered image sequences
    Kropp, Christopher
    Koch, Christian
    Koenig, Markus
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 86 : 11 - 32
  • [17] The adoption of 4D BIM in the UK construction industry: an innovation diffusion approach
    Gledson, Barry J.
    Greenwood, David
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (06) : 950 - 967
  • [18] The Creation of Construction Schedules in 4D BIM: A Comparison of Conventional and Automated Approaches
    Doukari, Omar
    Seck, Boubacar
    Greenwood, David
    [J]. BUILDINGS, 2022, 12 (08)
  • [19] Revolutionising the 4D BIM Process to Support Scheduling Requirements in Modular Construction
    Mayouf, Mohammad
    Jones, Jamie
    Elghaish, Faris
    Emam, Hassan
    Ekanayake, E. M. A. C.
    Ashayeri, Ilnaz
    [J]. SUSTAINABILITY, 2024, 16 (02)
  • [20] Dynamic construction material layout planning optimization model by integrating 4D BIM
    Min-Yuan Cheng
    Nai-Wen Chang
    [J]. Engineering with Computers, 2019, 35 : 703 - 720