Simulation optimization for the stochastic economic lot scheduling problem with sequence-dependent setup times

被引:16
|
作者
Loehndorf, Nils [1 ]
Riel, Manuel
Minner, Stefan [2 ]
机构
[1] Vienna Univ Econ & Business, Vienna, Austria
[2] Tech Univ Munich, D-80290 Munich, Germany
关键词
Inventory; Multi-product; Lot-sizing and scheduling; Stochastic demand; Sequence-dependent setups; Simulation optimization; BASE-STOCK POLICIES; FEASIBILITY; SYSTEMS;
D O I
10.1016/j.ijpe.2014.05.006
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider the stochastic economic lot scheduling problem (SELSP) with lost sales and random demand where switching between products is subject to sequence-dependent setup times. We propose a solution based on simulation optimization using an iterative two-step procedure which combines global policy search with local search heuristics for the traveling salesman sequencing subproblem. To optimize the production cycle, we compare two criteria: minimizing total setup times and evenly distributing setups to obtain a more regular production cycle. Based on a numerical study, we find that a policy with a balanced production cycle leads to lower cost than other policies with unbalanced cycles. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:170 / 176
页数:7
相关论文
共 50 条
  • [1] Single machine scheduling problem with stochastic sequence-dependent setup times
    Ertem, Mehmet
    Ozcelik, Feristah
    Sarac, Tugba
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (10) : 3273 - 3289
  • [2] The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
    Gupta, D
    Magnusson, T
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (04) : 727 - 747
  • [3] A note on "the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
    Almada-Lobo, Bernardo
    Oliveira, Jose F.
    Carravilla, Maria Antonia
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (04) : 1374 - 1376
  • [4] On the feasibility of sequence-dependent economic lot scheduling problem
    Shirodkar, Vinay A.
    Pillai, V. Madhusudanan
    Sridharan, R.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (10) : 2925 - 2939
  • [5] Modeling and optimization of the hybrid flow shop scheduling problem with sequence-dependent setup times
    Xue, Huiting
    Meng, Leilei
    Duan, Peng
    Zhang, Biao
    Zou, Wenqiang
    Sang, Hongyan
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2024, 15 (02) : 473 - 490
  • [6] A search heuristic for the sequence-dependent economic lot scheduling problem
    Wagner, BJ
    Davis, DJ
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 141 (01) : 133 - 146
  • [7] THE DISCRETE LOT-SIZING AND SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP COSTS
    FLEISCHMANN, B
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 75 (02) : 395 - 404
  • [8] A bicriteria scheduling with sequence-dependent setup times
    Eren, Tamer
    Guner, Ertan
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2006, 179 (01) : 378 - 385
  • [9] Simulation optimization for the stochastic economic lot scheduling problem
    Loehndorf, Nils
    Minner, Stefan
    [J]. IIE TRANSACTIONS, 2013, 45 (07) : 796 - 810
  • [10] ASSEMBLY LINE BALANCING PROBLEM WITH STOCHASTIC SEQUENCE-DEPENDENT SETUP TIMES
    Diri, Zulal
    Mete, Suleyman
    Cil, Zeynel Abidin
    Agpak, Kursad
    [J]. PAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI, 2015, 21 (04): : 152 - 157