共 50 条
- [4] Capacitated lot-sizing with sequence dependent setup costs [J]. OR SPEKTRUM, 1996, 18 (01) : 51 - 59
- [6] A hybrid simulated annealing for the single-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times and costs and dynamic release of jobs [J]. The International Journal of Advanced Manufacturing Technology, 2011, 54 : 1109 - 1119
- [7] A hybrid simulated annealing for the single-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times and costs and dynamic release of jobs [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 54 (9-12): : 1109 - 1119