共 50 条
- [1] Assembly line balancing problem with resource and sequence-dependent setup times (ALBPRS) [J]. JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2023, 38 (01): : 557 - 570
- [2] Modeling and solving assembly line worker assignment and balancing problem with sequence-dependent setup times [J]. Soft Computing, 2021, 25 : 12899 - 12914
- [6] The sequence-dependent assembly line balancing problem [J]. OR SPECTRUM, 2008, 30 (03) : 579 - 609
- [8] The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics [J]. OR Spectrum, 2013, 35 : 291 - 320
- [9] Multi-objective Assembly Line Balancing Problem with Bounded Processing Times, Learning Effect, and Sequence-dependent Setup Times [J]. 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 768 - 772