ASSEMBLY LINE BALANCING PROBLEM WITH STOCHASTIC SEQUENCE-DEPENDENT SETUP TIMES

被引:3
|
作者
Diri, Zulal [1 ]
Mete, Suleyman [1 ]
Cil, Zeynel Abidin [1 ]
Agpak, Kursad [1 ]
机构
[1] Gaziantep Univ, Muhendislik Fak, Endustri Muhendisligi Bolumu, Gaziantep, Turkey
关键词
Assembly line balancing; Setup time; Stochastic;
D O I
10.5505/pajes.2015.93723
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
There is limited number of papers which consider setup times in assembly line balancing literature. Additionally, in these studies setup times are assumed as deterministic. Nevertheless, task and setup times can include variation due to human factors, machine breakdowns, lack of equipment and environmental factors in real life applications. Therefore, in this study assembly line balancing problem with stochastic sequence-dependent setup time is studied. A mathematical model is proposed for solving the problem and computational analysis is made on certain test problems.
引用
收藏
页码:152 / 157
页数:6
相关论文
共 50 条
  • [1] Assembly line balancing problem with resource and sequence-dependent setup times (ALBPRS)
    Kilincci, Ozcan
    [J]. JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2023, 38 (01): : 557 - 570
  • [2] Modeling and solving assembly line worker assignment and balancing problem with sequence-dependent setup times
    Hamid Yilmaz
    [J]. Soft Computing, 2021, 25 : 12899 - 12914
  • [3] Modeling and solving assembly line worker assignment and balancing problem with sequence-dependent setup times
    Yilmaz, Hamid
    [J]. SOFT COMPUTING, 2021, 25 (20) : 12899 - 12914
  • [4] An efficient hybrid genetic algorithm to solve assembly line balancing problem with sequence-dependent setup times
    Yolmeh, Abdolmajid
    Kianfar, Farhad
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 62 (04) : 936 - 945
  • [5] The sequence-dependent assembly line balancing problem
    Armin Scholl
    Nils Boysen
    Malte Fliedner
    [J]. OR Spectrum, 2008, 30 : 579 - 609
  • [6] The sequence-dependent assembly line balancing problem
    Scholl, Armin
    Boysen, Nils
    Fliedner, Malte
    [J]. OR SPECTRUM, 2008, 30 (03) : 579 - 609
  • [7] The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics
    Scholl, Armin
    Boysen, Nils
    Fliedner, Malte
    [J]. OR SPECTRUM, 2013, 35 (01) : 291 - 320
  • [8] The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics
    Armin Scholl
    Nils Boysen
    Malte Fliedner
    [J]. OR Spectrum, 2013, 35 : 291 - 320
  • [9] Multi-objective Assembly Line Balancing Problem with Bounded Processing Times, Learning Effect, and Sequence-dependent Setup Times
    Hamta, Nima
    Ghomi, S. M. T. Fatemi
    Hakimi-Asiabar, M.
    Tabrizi, P. Hooshangi
    [J]. 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 768 - 772
  • [10] Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
    Andres, Carlos
    Miralles, Cristobal
    Pastor, Rafael
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) : 1212 - 1223