Performance Indicators for the Claim Management Process of Construction Projects

被引:0
|
作者
Seo, Wonkyoung [1 ]
Kang, Youngcheol [1 ]
机构
[1] Yonsei Univ, Dept Architecture & Architectural Engn, A560 Engn Hall 1, Seoul 03722, South Korea
关键词
DESIGN;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The purpose of this study is to investigate performance indicators measuring the effectiveness of the claim management process of construction projects. As current construction projects become larger and more complex, claim management becomes more diverse and important for the success of the project. Although claim management has been the subject of many previous research studies, few researchers have investigated performance indicators measuring the claim management process. After interviewing practitioners who have expertise in claims, the researchers for this study propose indicators representing the performance of the claim management process. These indicators can be used as performance measures to enable more detailed status checks and to improve the process for construction claim work, which will contribute to better claim management and more successful project delivery.
引用
收藏
页码:611 / 617
页数:7
相关论文
共 50 条
  • [31] Risk management and risk management performance measurement in the construction projects of Finland
    Rahman, Mohammad Shakilur
    Adnan, Tasminur Mannan
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (03) : 167 - 178
  • [32] A Study of Risk Management for Construction Process of Tunnel Engineering Projects
    Hu, Hao
    Li, Jingjing
    Wang, Feng
    Zhang, Jun
    [J]. 2010 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (MSE 2010), VOL 3, 2010, : 491 - 495
  • [33] The Project Management Process of Planning and Budgeting in Public Construction Projects
    Larsen, Jesper Kranker
    Ussing, Lene Faber
    Brunoe, Thomas Ditlev
    Lindhard, Soren Munch
    [J]. INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2015, 6 (04) : 20 - 33
  • [34] Interactive client centric design management process for construction projects
    Alhava, O.
    Laine, E.
    Kiviniemi, A.
    [J]. EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION 2014, 2015, : 593 - 599
  • [35] Cost Monitoring and Management Algorithms in the Construction Process of Building Projects
    Liu, Yang
    [J]. JOURNAL OF ELECTRICAL SYSTEMS, 2024, 20 (06) : 437 - 449
  • [36] A review of risk management process in construction projects of developing countries
    Bahamid, R. A.
    Doh, S. I.
    [J]. GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING 2017 (GCOMSE2017), 2017, 271
  • [37] Evaluation of Management Indicators in Projects
    Maghareh, Mohammad Reza
    Mohamrnadzadeh, Sudabeh
    Alinejad, Fatemeh Mohammad
    Maghareh, Rasool
    [J]. CONSTRUCTION AND PROJECT MANAGEMENT, ICCPM 2011, 2011, 15 : 49 - 54
  • [38] Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong
    Yeung, John F. Y.
    Chan, Albert P. C.
    Chan, Daniel W. M.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (03) : 277 - 301
  • [39] Use of indicators in the management of projects
    Montero Fernandez-Vivancos, Guillermo
    Onieva-Gimenez, Luis
    [J]. DYNA, 2016, 91 (02): : 127 - 127
  • [40] Study on the performance evaluation of construction contract management for large scale construction projects
    Liu, Hua
    Wang, Ting
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 701 - 706