Evaluation of Management Indicators in Projects

被引:0
|
作者
Maghareh, Mohammad Reza [1 ]
Mohamrnadzadeh, Sudabeh [1 ]
Alinejad, Fatemeh Mohammad [1 ]
Maghareh, Rasool [2 ]
机构
[1] Shiraz Univ, Sch Art & Architecture, Dept Architecture, Shiraz, Iran
[2] Natl Univ Singapore, Sch Comp, Dept Comp Sci, Singapore, Singapore
关键词
project management; managers; experts; consultants; contractors;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This research study provides a methodology for calculating management indicators in construction of projects; and compares the results obtained. The purpose of this study is to evaluate and compare the management indicators for construction projects based on the opinions of practitioners of the projects. As a case study, 22 expert authorities of the construction projects of Shiraz University have been asked about the indicators, using a questionnaire that was arranged. The responses were classified in two categories; 1) Consultants and Contractors (C & and 2) Managers and Experts (M&E). The completed questionnaires were assessed, analyzed and the indicators were calculated separately; based on the ideas of both groups. It is found that there is a similarity between the ideas of the two groups in 25 indicators out of 38. Furthermore, the difference between twelve other indicators based on both group's ideas is small. It means that in the evaluation of 37 indicators out of 38, the ideas of both groups are similar or close to each other; which may show the accuracy in completing the questionnaire and the methodology used. In this paper, this methodology is presented; and the results are discussed.
引用
收藏
页码:49 / 54
页数:6
相关论文
共 50 条
  • [1] The Design of Evaluation Indicators for Management of Public Facilities Construction Projects
    Chen Ling
    Zhang Wenqi
    [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2008, : 208 - 210
  • [2] Use of indicators in the management of projects
    Montero Fernandez-Vivancos, Guillermo
    Onieva-Gimenez, Luis
    [J]. DYNA, 2016, 91 (02): : 127 - 127
  • [3] Performance indicators for public evaluation of environmental management plan implementation in highway construction projects
    Dahalan, Nurol Huda
    Rahman, Rahimi A.
    Hassan, Siti Hafizan
    Ahmad, Saffuan Wan
    [J]. INTERNATIONAL JOURNAL OF DISASTER RESILIENCE IN THE BUILT ENVIRONMENT, 2024, 15 (03) : 425 - 449
  • [4] Indicators of collaborative design management in construction projects
    Savolainen, Jussi Matias
    Saari, Arto
    Mannisto, Anssi
    Kahkonen, Kalle
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2018, 16 (04) : 674 - 691
  • [5] System of management indicators for multidisciplinary educational projects
    Eizerik, Flavia
    Ferreira Danilevicz, Angela de Moura
    de Paula, Istefani Carisio
    [J]. EDUCATION POLICY ANALYSIS ARCHIVES, 2020, 28 : 1 - 46
  • [6] Performance Indicators for the Claim Management Process of Construction Projects
    Seo, Wonkyoung
    Kang, Youngcheol
    [J]. COMPUTING IN CIVIL ENGINEERING 2019: VISUALIZATION, INFORMATION MODELING, AND SIMULATION, 2019, : 611 - 617
  • [7] Evaluation of openBIM Projects: Indicators for the intensity of use of openBIM
    Fischer, S.
    Schranz, Ch.
    Urban, H.
    [J]. BAUINGENIEUR, 2022, 97 (06): : 206 - 214
  • [9] Selected indicators for evaluation of eco-innovation projects
    Stosic, Biljana
    Milutinovic, Radul
    Zakic, Nebojsa
    Zivkovic, Nedeljko
    [J]. INNOVATION-THE EUROPEAN JOURNAL OF SOCIAL SCIENCE RESEARCH, 2016, 29 (02) : 177 - 191
  • [10] Key indicators influencing the management of team integration in construction projects
    Ibrahim, Che Khairil Izam Che
    Costello, Seosamh B.
    Wilkinson, Suzanne
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2015, 8 (02) : 300 - 323