Performance Indicators for the Claim Management Process of Construction Projects

被引:0
|
作者
Seo, Wonkyoung [1 ]
Kang, Youngcheol [1 ]
机构
[1] Yonsei Univ, Dept Architecture & Architectural Engn, A560 Engn Hall 1, Seoul 03722, South Korea
关键词
DESIGN;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The purpose of this study is to investigate performance indicators measuring the effectiveness of the claim management process of construction projects. As current construction projects become larger and more complex, claim management becomes more diverse and important for the success of the project. Although claim management has been the subject of many previous research studies, few researchers have investigated performance indicators measuring the claim management process. After interviewing practitioners who have expertise in claims, the researchers for this study propose indicators representing the performance of the claim management process. These indicators can be used as performance measures to enable more detailed status checks and to improve the process for construction claim work, which will contribute to better claim management and more successful project delivery.
引用
收藏
页码:611 / 617
页数:7
相关论文
共 50 条
  • [1] Relationship between Consistency and Performance in the Claim Management Process for Construction Projects
    Seo, Wonkyoung
    Kwak, Young Hoon
    Kang, Youngcheol
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (06)
  • [2] Performance Indicators for the Claim Management of General Contractors
    Seo, Wonkyoung
    Kang, Youngcheol
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (06)
  • [3] Indicators of collaborative design management in construction projects
    Savolainen, Jussi Matias
    Saari, Arto
    Mannisto, Anssi
    Kahkonen, Kalle
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2018, 16 (04) : 674 - 691
  • [4] Decision Support System for Analyzing Key Performance Indicators in Construction Projects Management
    Ansari, R.
    Banihashemi, S. A.
    Taherkhani, R.
    Moradi, S.
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING, 2022, 35 (05): : 865 - 874
  • [5] Coordination process in construction projects management
    Alaloul, W. S.
    Liew, M. S.
    Zawawi, N. A.
    [J]. ENGINEERING CHALLENGES FOR SUSTAINABLE FUTURE, 2016, : 149 - 153
  • [6] Performance indicators for public evaluation of environmental management plan implementation in highway construction projects
    Dahalan, Nurol Huda
    Rahman, Rahimi A.
    Hassan, Siti Hafizan
    Ahmad, Saffuan Wan
    [J]. INTERNATIONAL JOURNAL OF DISASTER RESILIENCE IN THE BUILT ENVIRONMENT, 2024, 15 (03) : 425 - 449
  • [7] Identification and assessment of sustainability performance indicators for construction projects
    Rajabi, Sareh
    El -Sayegh, Sameh
    Romdhane, Lotfi
    [J]. ENVIRONMENTAL AND SUSTAINABILITY INDICATORS, 2022, 15
  • [8] A Study on Claim/Dispute Management Provisions in Japanese Public Construction Works and ODA Construction Projects
    Niraula, Rajendra
    Kusayanagi, Shunji
    [J]. IFOST: 2007 INTERNATIONAL FORUM ON STRATEGIC TECHNOLOGY, 2007, : 255 - +
  • [9] Assessing Environmental Management Plan Implementation in Water Supply Construction Projects: Key Performance Indicators
    Radzi, Afiqah R.
    Farouk, Abdelrahman M.
    Romali, Noor Suraya
    Farouk, Mohamed
    Elgamal, Mohamed
    Rahman, Rahimi A.
    [J]. SUSTAINABILITY, 2024, 16 (02)
  • [10] Public monitoring of environmental management plan implementation in road construction projects: key performance indicators
    Dahalan, Nurol Huda
    Rahman, Rahimi A.
    Ahmad, Saffuan Wan
    Ibrahim, Che Khairil Izam Che
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2023,