Lessons Learned in Risk Management on NCSX

被引:0
|
作者
Neilson, G. H. [1 ]
Gruber, C. O.
Harris, J. H. [2 ]
Rej, D. J. [1 ]
Simmons, R. T. [1 ]
Strykowsky, R. L. [1 ]
机构
[1] Princeton Plasma Phys Lab, POB 451,MS 38, Princeton, NJ 08543 USA
[2] Oak Ridge Natl Lab, Oak Ridge, TN 37831 USA
关键词
stellarator; NCSX; risk; management; MAGNETIC-FIELD; DESIGN; CONSTRUCTION; PHYSICS;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and sub-assemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.
引用
收藏
页码:136 / +
页数:2
相关论文
共 50 条
  • [41] Pharmacovigilance Network, a Tool Kit for Enhancing Risk Management; Lessons Learned from Thailand
    Thiankhanithikuni, K.
    Suwankesawong, W.
    DRUG SAFETY, 2015, 38 (10) : 1042 - 1042
  • [42] Improper Risk Management Outcomes and Lessons Learned from an EPC Water Transmission Project
    Abaza, Mohamed
    Kisi, Krishna
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (11)
  • [43] Rebuilding Operational Risk Management Capabilities: Lessons Learned from COVID-19
    Jadwani, Barkha
    Parkhi, Shilpa
    Karande, Kiran
    Barge, Prashant
    Brimavarapu, Venkata Mrudula
    Rastogi, Shailesh
    JOURNAL OF ASIAN FINANCE ECONOMICS AND BUSINESS, 2022, 9 (09): : 249 - 261
  • [44] Lessons Learned from the Financial Crisis for Risk Management: Contrasting Developments in Insurance and Banking
    Axel P Lehmann
    Daniel M Hofmann
    The Geneva Papers on Risk and Insurance - Issues and Practice, 2010, 35 : 63 - 78
  • [45] Lessons learned from the preparation of the flood risk management plans on the Seine basin and perspectives
    Dupray, Sebastien
    Lavallart, Caroline
    Salles, Elodie
    Vignasse, Isabelle
    HOUILLE BLANCHE-REVUE INTERNATIONALE DE L EAU, 2017, (04): : 13 - 19
  • [46] Lessons Learned from Applying Cyber Risk Management and Survivability Concepts to a Space Mission
    Knez, Claudia
    Schonfeld, Tibor
    Llanso, Thomas
    Sotzen, Kristin
    Pearson, Dallas
    2016 IEEE AEROSPACE CONFERENCE, 2016,
  • [47] Risk management in public sector research: approach and lessons learned at a national research organization
    Leung, Flavia
    Isaacs, Frances
    R & D MANAGEMENT, 2008, 38 (05) : 510 - 519
  • [48] An evidence-based approach to fall risk assessment, prevention, and management - Lessons learned
    Poe, SS
    Cvach, MM
    Gartrell, DG
    Radzik, BR
    Joy, TL
    JOURNAL OF NURSING CARE QUALITY, 2005, 20 (02) : 107 - 116
  • [49] Risk and error management. Can medicine benefit from lessons learned in aviation?
    Mueller, Manfred
    BUNDESGESUNDHEITSBLATT-GESUNDHEITSFORSCHUNG-GESUNDHEITSSCHUTZ, 2015, 58 (01) : 95 - 99
  • [50] Surgical Management of Binder Syndrome: Lessons Learned
    Jeffrey C. Posnick
    Aesthetic Plastic Surgery, 2010, 34 : 731 - 733