Lessons Learned in Risk Management on NCSX

被引:0
|
作者
Neilson, G. H. [1 ]
Gruber, C. O.
Harris, J. H. [2 ]
Rej, D. J. [1 ]
Simmons, R. T. [1 ]
Strykowsky, R. L. [1 ]
机构
[1] Princeton Plasma Phys Lab, POB 451,MS 38, Princeton, NJ 08543 USA
[2] Oak Ridge Natl Lab, Oak Ridge, TN 37831 USA
关键词
stellarator; NCSX; risk; management; MAGNETIC-FIELD; DESIGN; CONSTRUCTION; PHYSICS;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and sub-assemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.
引用
收藏
页码:136 / +
页数:2
相关论文
共 50 条
  • [21] Lessons learned from COVID-19 response for disaster risk management
    Ashraf, Adil
    NATURAL HAZARDS, 2021, 107 (02) : 2027 - 2032
  • [22] A Risk Management Perspective on Climate Change: Lessons Learned from the Nuclear Industry
    Ian G. McKinley
    Julia M. West
    Susie M. L. Hardie
    Environmental Management, 2022, 69 : 835 - 846
  • [23] MAVEN Information Security Governance, Risk Management, and Compliance (GRC): Lessons Learned
    Takamura, Eduardo
    Gomez-Rosa, Carlos
    Mangum, Kevin
    Wasiak, Fran
    2014 IEEE AEROSPACE CONFERENCE, 2014,
  • [24] A Risk Management Perspective on Climate Change: Lessons Learned from the Nuclear Industry
    McKinley, Ian G.
    West, Julia M.
    Hardie, Susie M. L.
    ENVIRONMENTAL MANAGEMENT, 2022, 69 (05) : 835 - 846
  • [25] Supply chain risk management: the lessons learned from the Egyptian revolution 2011
    Elzarka, Sara M.
    INTERNATIONAL JOURNAL OF LOGISTICS-RESEARCH AND APPLICATIONS, 2013, 16 (06) : 482 - 492
  • [26] Lessons Learned to Aid in Developing Fatigue Risk Management Plans for Resident Physicians
    Kassam, Aliya
    Cowan, Michele
    Topps, Maureen
    TEACHING AND LEARNING IN MEDICINE, 2019, 31 (02) : 136 - 145
  • [27] Faster, better, cheaper - NASA's lessons learned: Robust risk management©
    Greenfield, Michael A.
    American Astronautical Society, Scientific Technology Series, 2001, 106 : 23 - 28
  • [28] Toward Global Sediment Management: Lessons Learned From a Multidimensional Risk Assessment
    Radenovic, Dunja
    Slijepcevic, Natasa
    Tomic, Tanja
    Tenodi, Slaven
    Krcmar, Dejan
    Beljin, Jelena
    Pilipovic, Dragana Tomasevic
    CLEAN-SOIL AIR WATER, 2025, 53 (01)
  • [29] EPA's RMP: Lessons learned from state risk management programs
    Moore, DA
    Garcia, DM
    AMMONIA PLANT SAFETY & RELATED FACILITIES, VOL 38, 1998, 38 : 171 - 178
  • [30] Lessons learned from COVID-19 response for disaster risk management
    Adil Ashraf
    Natural Hazards, 2021, 107 : 2027 - 2032