Lessons Learned in Risk Management on NCSX

被引:0
|
作者
Neilson, G. H. [1 ]
Gruber, C. O.
Harris, J. H. [2 ]
Rej, D. J. [1 ]
Simmons, R. T. [1 ]
Strykowsky, R. L. [1 ]
机构
[1] Princeton Plasma Phys Lab, POB 451,MS 38, Princeton, NJ 08543 USA
[2] Oak Ridge Natl Lab, Oak Ridge, TN 37831 USA
关键词
stellarator; NCSX; risk; management; MAGNETIC-FIELD; DESIGN; CONSTRUCTION; PHYSICS;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and sub-assemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.
引用
收藏
页码:136 / +
页数:2
相关论文
共 50 条
  • [1] Lessons Learned in Risk Management on NCSX
    Neilson, G. H.
    Gruber, C. O.
    Harris, J. H.
    Rej, D. J.
    Simmons, R. T.
    Strykowsky, R. L.
    IEEE TRANSACTIONS ON PLASMA SCIENCE, 2010, 38 (03) : 320 - 327
  • [2] ENGINEERING COST & SCHEDULE LESSONS LEARNED ON NCSX
    Strykowsky, R. L.
    Brown, T.
    Chrzanowski, J.
    Cole, M.
    Heitzenroeder, P.
    Neilson, G. H.
    Rej, Donald
    Viola, M.
    2009 23RD IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, 2009, : 345 - +
  • [3] Engineering management lessons on NCSX
    Reiersen, W. T.
    Neilson, G. H.
    21ST IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING - SOFE 05, 2006, : 223 - 226
  • [4] Lessons Learned During the Manufacture of the NCSX Modular Coils
    Chrzanowski, James H.
    Meighan, Thomas G.
    Raftopoulos, Steven
    Dudek, Lawrence
    Fogarty, Paul J.
    2009 23RD IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, 2009, : 329 - +
  • [5] Operational, Quality, and Risk Management in the Transfusion Service: Lessons Learned
    Goodnough, Lawrence Tim
    TRANSFUSION MEDICINE REVIEWS, 2012, 26 (03) : 252 - 261
  • [6] Lessons learned in disaster risk management from citizen participation
    Canese de Estigarribia, Marta Isabel
    Granada, Violeta Prieto
    Britez, Alberto
    Vuyk Espinola, Cecilia Maria
    Lezcano, Jose
    Chamorro, Romilio
    REVISTA DEL CLAD REFORMA Y DEMOCRACIA, 2021, (81) : 251 - 278
  • [7] Risk management and lessons learned solutions for satellite product assurance
    Larrère, JL
    ACTA ASTRONAUTICA, 2004, 55 (3-9) : 811 - 816
  • [8] A History of Space Toxicology Mishaps: Lessons Learned and Risk Management
    James, John T.
    SAE INTERNATIONAL JOURNAL OF AEROSPACE, 2011, 4 (01): : 577 - 583
  • [9] Lessons Learned: Management of Change
    Jakubowski, J. A.
    Professional Safety, 1996, 41 (11):
  • [10] PROJECT MANAGEMENT AND LESSONS LEARNED
    Tull, A.
    GERONTOLOGIST, 2009, 49 : 503 - 503