A risk identification procedure for construction contracts - a case study of power station projects in Egypt

被引:22
|
作者
Hassanein, Amr A. G. [1 ]
Afify, Hala M. F. [1 ]
机构
[1] Amer Univ Cairo, Cairo, Egypt
关键词
risk management; risk identification; Egypt; construction contracts; risk checklist;
D O I
10.1080/10286600600910104
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The process of risk management is generally divided into three phases: risk identification, risk analysis and risk response. From these three phases, the concept of risk identification appears to be the most known and practiced. The development of a more formalized, yet easy to use risk identification method is of extreme importance. This research focuses on risk identification as it relates to the Egyptian business environment including its procurement laws and regulations. Egypt is a developing country where the business environment emphasizes certain risks while diminishing others when compared with other countries. This study tackles risk identification by investigating the most significant risks related to construction contracts for two power station projects in Egypt. These had typical characteristics such as large scale, fast track projects where a multi-package contracting plan was utilized. Ultimately, a checklist of risk categories was developed to aid contractors in their risk identification effort. The compilation of this checklist identified seven risk categories: (1) owner's obligations; (2) interface with other contractors; (3) liability risks; (4) financial risks; (5) risks related to changes; (6) technical risks; and (7) consortium risks.
引用
收藏
页码:3 / 14
页数:12
相关论文
共 50 条
  • [21] Risk Paths in International Construction Projects: Case Study from Chinese Contractors
    Liu, Junying
    Zhao, Xianbo
    Yan, Peng
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (06)
  • [22] Risk factors in oil and gas construction projects in developing countries: a case study
    Kassem, Mukhtar A.
    Khoiry, Muhamad Azry
    Hamzah, Noraini
    [J]. INTERNATIONAL JOURNAL OF ENERGY SECTOR MANAGEMENT, 2019, 13 (04) : 846 - 861
  • [23] Risk Manageability Assessment to Improve Risk Response Plan: Case Study of Construction Projects in Iran
    Charkhakan, Mohammad Hadi
    Heravi, Gholamreza
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (11)
  • [24] Risk identification framework in construction of Egyptian mega housing projects
    Nabawy, Mohamed
    Ofori, George
    Morcos, Maged
    Egbu, Charles
    [J]. AIN SHAMS ENGINEERING JOURNAL, 2021, 12 (02) : 2047 - 2056
  • [25] Risk allocation in public construction projects: the case of Jordan
    Hiyassat, Mohammed A.
    Alkasagi, Fatima
    El-Mashaleh, Mohammad
    Sweis, Ghaleb J.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (08) : 1478 - 1488
  • [26] IDENTIFICATION OF CAUSES OF RISK IN THE MANAGEMENT OF LARGE CONSTRUCTION PROJECTS IN SPAIN
    Rebollar-Rubio, Ruben
    Lidon-Lopez, Ivan
    Perez-Cebrian, Alfonso
    [J]. DYNA, 2012, 87 (06): : 689 - 697
  • [27] Identification and analysing of risk factors affecting cost of construction projects
    Vivek, Attada
    Rao, C. H. Hanumantha
    [J]. MATERIALS TODAY-PROCEEDINGS, 2022, 60 : 1696 - 1701
  • [28] Risk identification on community-based construction projects in Zambia
    Manelele, I.
    Muya, M.
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2008, 6 (02) : 145 - 161
  • [29] Identification of strategies for enhancing the risk resilience of construction projects as systems
    Sladowski, Grzegorz
    Sroka, Bartlomiej
    Szewczyk, Bartlomiej
    Barnas, Krzysztof
    [J]. AUTOMATION IN CONSTRUCTION, 2024, 166
  • [30] Radon concentration in the tunnels of a hydroelectric power station under construction in Italy, a case study
    Verdelocco, S
    Walker, D
    Turkowsky, P
    [J]. Natural Radiation Environment VII, 2005, 7 : 215 - 220