Risk allocation in public construction projects: the case of Jordan

被引:22
|
作者
Hiyassat, Mohammed A. [1 ]
Alkasagi, Fatima [1 ]
El-Mashaleh, Mohammad [2 ]
Sweis, Ghaleb J. [1 ]
机构
[1] Univ Jordan, Civil Engn Dept, Amman, Jordan
[2] Hashemite Univ, Civil Engn Dept, Amman, Jordan
关键词
Risk factors; risk allocation; construction project; public projects; Jordan; MANAGEMENT;
D O I
10.1080/15623599.2020.1728605
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Proper risk identification, assessment, and allocation can reduce cost and time delay. This study identifies, assesses and allocates risks in public construction projects in Jordan with the goal of reducing the overall costly claims and disputes. Based on extensive literature review, the study identifies 62 risk factors that are grouped under 14 categories. The respondents were asked to estimate the probability, impact and proper allocation of these risk factors. Based on 208 valid responses, the results indicate that the top ranked risk factors are delays in client's payments, poorly tailored contract forms, competition, delay in approval of permits, default by subcontractors, unclear specifications, material prices fluctuations, different construction standards, change in design, and poor design. The respondents of the study recommend 4 risk factors to be shouldered by owners, five risk factors to be shouldered by contractors, and 42 risk factors to be shared by the contracting parties. The results of the study also help practitioners to allocate risks to the stakeholder who is more capable to assesses, controls and manages these risks. The generated risk priority can be used to prioritize the risks for response planning.
引用
收藏
页码:1478 / 1488
页数:11
相关论文
共 50 条
  • [1] Risk Allocation of Public-Private Partnerships in Public Stadium Construction Projects
    Cheng Min
    Shi Xiajun
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1338 - 1342
  • [2] The allocation of risk in PPP construction projects
    Cao, Yubo
    Zhang, Lianying
    PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2008, : 285 - 292
  • [3] Risk management in public sector construction projects: Case studies in Lesotho
    Nketekete, Molefi
    Emuze, Fidelis
    Smallwood, John
    ACTA STRUCTILIA, 2016, 23 (02) : 1 - 24
  • [4] Risk Assessment and Allocation in Highway Construction Projects in the UAE
    El-Sayegh, Sameh M.
    Mansour, Mahmoud H.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (06)
  • [5] Dynamic modeling of the quantitative risk allocation in construction projects
    Nasirzadeh, Farnad
    Khanzadi, Mostafa
    Rezaie, Mahdi
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (03) : 442 - 451
  • [6] Barriers to Achieving Sustainability in Highway Construction Projects: The Case of Jordan
    Aljboor, Ahmad
    Imam, Rana
    Alawneh, Rami
    SUSTAINABILITY, 2023, 15 (13)
  • [7] Risk Allocation in Public-Private Partnership Projects
    Jin Xiaohua
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 326 - 330
  • [8] Risk allocation and benefit distribution of PPP projects for construction waste recycling: a case study of China
    Wang, Zhenshuang
    Zhou, Yanxin
    Jin, Xiaohua
    Zhao, Ning
    Sun, Jianshu
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (09) : 3927 - 3956
  • [9] The Impact of Information Technology (IT) Adoption on the Quality of Construction Projects: The Case of Jordan
    Sweis, Ghaleb J.
    Sweis, Rateb J.
    Al-Shboul, Muhannad A.
    Al-Dweik, Ghadeer A.
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2015, 6 (03) : 26 - 40
  • [10] Improving Performance in Construction Projects: A Case Study of Malaysian Public Projects
    Yusof, Aminah Md
    Khoso, Ali Raza
    Sohu, Samiullah
    Khahro, Shabir Hussain
    Chai, Chang Saar
    PERTANIKA JOURNAL OF SCIENCE AND TECHNOLOGY, 2021, 29 (04): : 2579 - 2604