Optimising and simulating the assembly line balancing problem in a motorcycle manufacturing company: a case study

被引:29
|
作者
Cortes, Pablo [1 ]
Onieva, Luis [1 ]
Guadix, Jose [1 ]
机构
[1] Univ Seville, Dept Ind Engn, E-41092 Seville, Spain
关键词
motorcycle; assembly line; lead time; simulation;
D O I
10.1080/00207540902926522
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we present a real life assembly line balancing problem for a motorcycle manufacturing company. Results from the initial situation in the company are compared to those provided by a heuristic method and by a novel neighbourhood search method. An ARENA simulation model is developed to test the different proposals. The model was validated by comparing the simulation results from the initial company scenario with the real operation results. Consequently, the extension to the developed proposals allows us to select an adequate assembly line for the company, resulting in a greater productivity level and a more balanced line with respect to the operation times in the stations and the activity of the workers. The company has subsequently implemented our proposed schedule, obtaining remarkable improvements in its productivity.
引用
收藏
页码:3637 / 3656
页数:20
相关论文
共 50 条
  • [1] Assembly line balancing the comparison of COMSOAL and MSNSH technique in Motorcycle manufacturing company
    Lerttira, Areeda
    Yarlagadda, Prasad K. D. V.
    [J]. ADVANCED DESIGNS AND RESEARCHES FOR MANUFACTURING, PTS 1-3, 2013, 605-607 : 166 - 174
  • [2] Balancing and Simulation of Assembly Line in an LCD Manufacturing Company
    Buyuksaatci, Sinem
    Tuysuz, Fatih
    Bilen, Kemal
    [J]. 2015 6TH INTERNATIONAL CONFERENCE ON MODELING, SIMULATION, AND APPLIED OPTIMIZATION (ICMSAO), 2015,
  • [3] A study of assembly line balancing problem in clothing manufacturing by simulation
    Kursun, Senem
    Kalaoglu, Fatma
    Bahadir, Cagri
    Gocek, Ikilem
    [J]. PROCEEDINGS OF THE 16TH IASTED INTERNATIONAL CONFERENCE ON APPLIED SIMULATION AND MODELLING, 2007, : 94 - +
  • [4] LEAN MANUFACTURING THINKING IN ASSEMBLY LINE BALANCING PROBLEM
    Grzechca, Waldemar
    [J]. CLC 2013: CARPATHIAN LOGISTICS CONGRESS - CONGRESS PROCEEDINGS, 2014, : 173 - 178
  • [5] The Assembly Line Balancing Problem with Task Splitting: A Case Study
    Grzechca, W.
    Foulds, L. R.
    [J]. IFAC PAPERSONLINE, 2015, 48 (03): : 2002 - 2008
  • [6] Assembly line balancing in a clothing company
    Eryuruk, S. H.
    Kalaoglu, F.
    Baskak, M.
    [J]. FIBRES & TEXTILES IN EASTERN EUROPE, 2008, 16 (01) : 93 - 98
  • [7] A Mathematical Model for Two-sided Assembly Line Balancing Problem in Motorcycle Production
    Mohammed, Fatini Dalili
    Juin, Tan Wan
    Zakaria, Mohd Zakimi
    Ramli, Mohammad Fadzli
    [J]. 2018 IEEE 5TH INTERNATIONAL CONFERENCE ON SMART INSTRUMENTATION, MEASUREMENT AND APPLICATION (ICSIMA), 2018,
  • [8] Assembly Line Balancing with Method Ranking Positional Weight (case study: XYZ Company)
    Ginting, Rosnani
    William
    [J]. 2ND INTERNATIONAL CONFERENCE ON INDUSTRIAL AND MANUFACTURING ENGINEERING (ICI&ME 2020), 2020, 1003
  • [9] Simulation for Balancing of Assembly Line using Heuristics: A Case Study of Automotive Manufacturing Industry
    Salami, Musharaf
    Liu, Xiao-Jun
    [J]. 2022 IEEE 6TH ADVANCED INFORMATION TECHNOLOGY, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IAEAC), 2022, : 1674 - 1678
  • [10] Reducing High Setup Time in Assembly Line: A Case Study of Automotive Manufacturing Company in Malaysia
    Esa, Mashitah Mohamed
    Rahman, Nor Azian Abdul
    Jamaludin, Maizurah
    [J]. 2ND GLOBAL CONFERENCE ON BUSINESS AND SOCIAL SCIENCES (GCBSS-2015) ON MULTIDISCIPLINARY PERSPECTIVES ON MANAGEMENT AND SOCIETY, 2015, 211 : 215 - 220