Optimising and simulating the assembly line balancing problem in a motorcycle manufacturing company: a case study

被引:29
|
作者
Cortes, Pablo [1 ]
Onieva, Luis [1 ]
Guadix, Jose [1 ]
机构
[1] Univ Seville, Dept Ind Engn, E-41092 Seville, Spain
关键词
motorcycle; assembly line; lead time; simulation;
D O I
10.1080/00207540902926522
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we present a real life assembly line balancing problem for a motorcycle manufacturing company. Results from the initial situation in the company are compared to those provided by a heuristic method and by a novel neighbourhood search method. An ARENA simulation model is developed to test the different proposals. The model was validated by comparing the simulation results from the initial company scenario with the real operation results. Consequently, the extension to the developed proposals allows us to select an adequate assembly line for the company, resulting in a greater productivity level and a more balanced line with respect to the operation times in the stations and the activity of the workers. The company has subsequently implemented our proposed schedule, obtaining remarkable improvements in its productivity.
引用
收藏
页码:3637 / 3656
页数:20
相关论文
共 50 条
  • [41] An exact approach for the robust assembly line balancing problem
    Pereira, Jordi
    Alvarez-Miranda, Eduardo
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2018, 78 : 85 - 98
  • [42] Stability measure for a generalized assembly line balancing problem
    Gurevsky, Evgeny
    Battaia, Olga
    Dolgui, Alexandre
    DISCRETE APPLIED MATHEMATICS, 2013, 161 (03) : 377 - 394
  • [43] SOLVING THE ASSEMBLY LINE BALANCING PROBLEM IN THE EDUCATIONAL ENVIRONMENT
    Ilic, Oliver
    Cvetic, Biljana
    METALURGIA INTERNATIONAL, 2012, 17 (06): : 58 - 62
  • [44] The sequence-dependent assembly line balancing problem
    Armin Scholl
    Nils Boysen
    Malte Fliedner
    OR Spectrum, 2008, 30 : 579 - 609
  • [45] Assembly Line Balancing Problem with Quality Inspection Stations
    Grzechca, Waldemar
    PROCEEDINGS OF THE 2015 7TH IEEE INTERNATIONAL CONFERENCE ON CYBERNETICS AND INTELLIGENT SYSTEMS (CIS) AND ROBOTICS, AUTOMATION AND MECHATRONICS (RAM), 2015,
  • [46] Optimizing ergonomic in manual assembly line balancing problem
    Tkitek, Zainab
    Triki, Hager
    2022 INTERNATIONAL CONFERENCE ON DECISION AID SCIENCES AND APPLICATIONS (DASA), 2022, : 842 - 845
  • [47] Analysis of the simple assembly line balancing problem complexity
    Alvarez-Miranda, Eduardo
    Pereira, Jordi
    Vila, Mariona
    COMPUTERS & OPERATIONS RESEARCH, 2023, 159
  • [48] COST ORIENTED STOCHASTIC ASSEMBLY LINE BALANCING PROBLEM
    Foroughi, Ahad
    Gokcen, Hadi
    JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2014, 29 (03): : 469 - 476
  • [49] Optimization of Cycle Time in an Assembly Line Balancing Problem
    Raj, Vishnu A. S.
    Mathew, Jeeno
    Jose, Peter
    Sivan, Gishnu
    1ST GLOBAL COLLOQUIUM ON RECENT ADVANCEMENTS AND EFFECTUAL RESEARCHES IN ENGINEERING, SCIENCE AND TECHNOLOGY - RAEREST 2016, 2016, 25 : 1146 - 1153
  • [50] Difficulties in estimation the quality of assembly line balancing problem
    Grzechca, Waldemar
    2015 20TH INTERNATIONAL CONFERENCE ON METHODS AND MODELS IN AUTOMATION AND ROBOTICS (MMAR), 2015, : 1179 - 1184