Optimising and simulating the assembly line balancing problem in a motorcycle manufacturing company: a case study

被引:30
|
作者
Cortes, Pablo [1 ]
Onieva, Luis [1 ]
Guadix, Jose [1 ]
机构
[1] Univ Seville, Dept Ind Engn, E-41092 Seville, Spain
关键词
motorcycle; assembly line; lead time; simulation;
D O I
10.1080/00207540902926522
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we present a real life assembly line balancing problem for a motorcycle manufacturing company. Results from the initial situation in the company are compared to those provided by a heuristic method and by a novel neighbourhood search method. An ARENA simulation model is developed to test the different proposals. The model was validated by comparing the simulation results from the initial company scenario with the real operation results. Consequently, the extension to the developed proposals allows us to select an adequate assembly line for the company, resulting in a greater productivity level and a more balanced line with respect to the operation times in the stations and the activity of the workers. The company has subsequently implemented our proposed schedule, obtaining remarkable improvements in its productivity.
引用
收藏
页码:3637 / 3656
页数:20
相关论文
共 50 条
  • [31] Applying Line Balancing to Improve Production Line Efficiency: A Case Study of an Automotive Company
    Singhtaun, Chansiri
    Pipattanapoonsin, Veerawit
    13TH INTERNATIONAL CONFERENCE ON INFORMATION COMMUNICATION AND MANAGEMENT, ICICM 2023, 2023, : 21 - 25
  • [32] Minimization of Bottleneck and Workstations for Assembly Line Balancing Problem in Power Transformer Manufacturing Using Heuristics
    Abu Bakar, Nurhanani
    Ramli, Mohammad Fadzli
    Zakaria, Mohd Zakimi
    Sin, Tan Chan
    Masran, Hafiz
    2018 IEEE 5TH INTERNATIONAL CONFERENCE ON SMART INSTRUMENTATION, MEASUREMENT AND APPLICATION (ICSIMA), 2018,
  • [33] Hybrid genetic algorithm to solve resource constrained assembly line balancing problem in footwear manufacturing
    Nguyen Thi Phuong Quyen
    Chen, James C.
    Yang, Chao-Lung
    SOFT COMPUTING, 2017, 21 (21) : 6279 - 6295
  • [34] Hybrid genetic algorithm to solve resource constrained assembly line balancing problem in footwear manufacturing
    Nguyen Thi Phuong Quyen
    James C. Chen
    Chao-Lung Yang
    Soft Computing, 2017, 21 : 6279 - 6295
  • [35] Multi-objective multi-model assembly line balancing problem: a quantitative study in engine manufacturing industry
    Abolfazl Jafari Asl
    Maghsud Solimanpur
    Ravi Shankar
    OPSEARCH, 2019, 56 : 603 - 627
  • [36] Multi-objective multi-model assembly line balancing problem: a quantitative study in engine manufacturing industry
    Asl, Abolfazl Jafari
    Solimanpur, Maghsud
    Shankar, Ravi
    OPSEARCH, 2019, 56 (03) : 603 - 627
  • [37] ON THE FLEXIBILITY CONSTRAINED LINE BALANCING PROBLEM IN LEAN MANUFACTURING
    Gursoy, Arif
    Gursoy, Necla Kircali
    TEKSTIL VE KONFEKSIYON, 2015, 25 (04): : 345 - 351
  • [38] Study on the Application of Industrial Engineering Methods on Production Line Balancing Problem in T Company
    Pei, Xiaobing
    Xu, Qingtao
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON MECHATRONICS ENGINEERING AND INFORMATION TECHNOLOGY (ICMEIT 2017), 2017, 70 : 38 - 41
  • [39] Balancing a robotic spot welding manufacturing line: An industrial case study
    Lopes, Thiago Cantos
    Sikora, C. G. S.
    Molina, Rafael Gobbi
    Schibelbain, Daniel
    Rodrigues, L. C. A.
    Magatao, Leandro
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 263 (03) : 1033 - 1048
  • [40] The sequence-dependent assembly line balancing problem
    Scholl, Armin
    Boysen, Nils
    Fliedner, Malte
    OR SPECTRUM, 2008, 30 (03) : 579 - 609