Reducing work in process (WIP) with fuzzy logic at job shop scheduling

被引:0
|
作者
Canbolat, YB [1 ]
Ariduru, A [1 ]
Gundogar, E [1 ]
Aksoy, MS [1 ]
机构
[1] Qafqaz Univ, Dept Ind Engn, Baku, Azerbaijan
关键词
scheduling; dynamic; AI-supported simulation; decision support system; AI in simulation;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The job shop is the most widely used production organization. The job shop production control system should schedule the incoming orders according to the capacity constraint of individual workstations or processes. One of the problems encountered at the job shop scheduling is minimum production size of machine, which is different from each other. Whereas 100 units order can be opened to some machine, 1000 units order can be opened another. This case increases WIP. In this study, a new approach was improved to reduce WIP. In this new approach, the parts, which materials are in stock and ordered very frequently are assigned to machine to reduce WIP. The new approach improved in this study is not applied at traditional job shop effectively. In this study, fuzzy logic is used to cope with this problem. Fuzzy logic determines which order assigned to the slack machine reviewing the minimum order size, materials size, load size of next machine, and order frequency. New approach was simulated at the job shop that has 15 machine and 50 orders. Simulation results show that new approach reduces WIP.
引用
收藏
页码:271 / 275
页数:5
相关论文
共 50 条
  • [1] Job shop scheduling using fuzzy logic
    O. Bilkay
    O. Anlagan
    S. E. Kilic
    [J]. The International Journal of Advanced Manufacturing Technology, 2004, 23 : 606 - 619
  • [2] Job shop scheduling using fuzzy logic
    Bilkay, O
    Anlagan, O
    Kilic, SE
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2004, 23 (7-8): : 606 - 619
  • [3] Fuzzy job shop scheduling
    Kuroda, M
    Wang, Z
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1996, 44 (1-2) : 45 - 51
  • [4] MINIMIZATION OF WORK-IN-PROCESS INVENTORY IN HYBRID FLOW SHOP SCHEDULING USING FUZZY LOGIC
    Paul, Sanjoy K.
    Azeem, Abdullahil
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2010, 17 (02): : 115 - 127
  • [5] A controlled genetic algorithm by fuzzy logic and belief functions for job-shop scheduling
    Hajri, S
    Liouane, N
    Hammadi, S
    Borne, P
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS, 2000, 30 (05): : 812 - 818
  • [6] Animation of a job shop scheduling process
    Shaw, WH
    Li, YE
    [J]. PIONEERING NEW TECHNOLOGIES: MANAGEMENT ISSUES AND CHALLENGES IN THE THIRD MILLENNIUM, PROCEEDINGS, 1998, : 28 - 33
  • [8] FUZZY CONSTRAINTS IN JOB-SHOP SCHEDULING
    DUBOIS, D
    FARGIER, H
    PRADE, H
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 1995, 6 (04) : 215 - 234
  • [9] Fuzzy priority rule for job shop scheduling
    Canbolat, YB
    Gundogar, E
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2004, 15 (04) : 527 - 533
  • [10] Fuzzy priority rule for job shop scheduling
    Yavuz Burak Canbolat
    Emin Gundogar
    [J]. Journal of Intelligent Manufacturing, 2004, 15 : 527 - 533