Fuzzy priority rule for job shop scheduling

被引:37
|
作者
Canbolat, YB
Gundogar, E
机构
[1] Wayne State Univ, Dept Ind & Mfg Engn, Detroit, MI 48202 USA
[2] Sakarya Univ, Dept Ind Engn, Fac Engn, TR-54040 Esentepe, Adapazari, Turkey
关键词
scheduling; priority rules; fuzzy logic; FPR;
D O I
10.1023/B:JIMS.0000034116.50789.df
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Job shop scheduling uses various kinds of priority rules such as SPT, CR, COVERT, etc. Each of these rules aims at satisfying a single criterion though scheduling is a multi criteria problem. In this paper, a new approach using fuzzy logic is introduced to combine SPT, CR priority rules, and next machine's load (NML) rate the job to be processed next in order to satisfy not only a single objective but also all objectives. Fuzzy logic calculates priority value by considering SPT, CR, and NML. We named this priority rule as fuzzy priority rule (FPR). The job with the highest priority value is assigned to machine to be processed. To compare FPR with other priority rules such as SPT, EDD, etc. we run simulation. The results indicate significant improvements on mean flow time, mean tardiness, work in process (WIP), and throughput simultaneously.
引用
收藏
页码:527 / 533
页数:7
相关论文
共 50 条
  • [1] Fuzzy priority rule for job shop scheduling
    Yavuz Burak Canbolat
    Emin Gundogar
    [J]. Journal of Intelligent Manufacturing, 2004, 15 : 527 - 533
  • [2] Effective job shop priority scheduling
    Veeke, Hans P. M.
    Lodewijks, Gabrel L.
    [J]. 4TH INTERNATIONAL INDUSTRIAL SIMULATION CONFERENCE 2006, 2006, : 437 - +
  • [3] Fuzzy job shop scheduling
    Kuroda, M
    Wang, Z
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1996, 44 (1-2) : 45 - 51
  • [4] Development and Analysis of Fuzzy Priority Rules for Scheduling a Dynamic Job Shop Production System
    Vinod, V.
    Sridharan, R.
    [J]. IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1418 - +
  • [5] FUZZY CONSTRAINTS IN JOB-SHOP SCHEDULING
    DUBOIS, D
    FARGIER, H
    PRADE, H
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 1995, 6 (04) : 215 - 234
  • [6] Job shop scheduling using fuzzy logic
    O. Bilkay
    O. Anlagan
    S. E. Kilic
    [J]. The International Journal of Advanced Manufacturing Technology, 2004, 23 : 606 - 619
  • [7] Job shop scheduling using fuzzy logic
    Bilkay, O
    Anlagan, O
    Kilic, SE
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2004, 23 (7-8): : 606 - 619
  • [8] Evaluation and Selection of Best Priority Sequencing Rule in Job Shop Scheduling using Hybrid MCDM Technique
    Kumar, Kalla Kiran
    Nagaraju, Dega
    Gayathri, S.
    Narayanan, S.
    [J]. FRONTIERS IN AUTOMOBILE AND MECHANICAL ENGINEERING, 2017, 197
  • [9] Hybrid Genetic Algorithm with Priority Rule-based Reconstruction for Flexible Job-shop Scheduling
    Yokoyama, Soichiro
    Iizuka, Hiroyuki
    Yamamoto, Masahito
    [J]. 2014 JOINT 7TH INTERNATIONAL CONFERENCE ON SOFT COMPUTING AND INTELLIGENT SYSTEMS (SCIS) AND 15TH INTERNATIONAL SYMPOSIUM ON ADVANCED INTELLIGENT SYSTEMS (ISIS), 2014, : 749 - 754
  • [10] EXPERIMENTS WITH SIX RULE IN JOB-SHOP SCHEDULING
    EILON, S
    CHOWDHURY, IG
    SERGHIOU, SS
    [J]. SIMULATION, 1975, 24 (02) : 45 - 48