A high performing metaheuristic for job shop scheduling with sequence-dependent setup times

被引:34
|
作者
Naderi, B. [1 ]
Ghomi, S. M. T. Fatemi [1 ]
Aminnayeri, M. [1 ]
机构
[1] Amir Kabir Univ Technol, Dept Ind Engn, Tehran, Iran
关键词
Scheduling; Job shop; Sequence-dependent setup times; Simulated annealing; Taguchi method; SIMULATED ANNEALING ALGORITHM; GENETIC ALGORITHMS; IMMUNE ALGORITHM; BOUND METHOD; SEARCH; COSTS;
D O I
10.1016/j.asoc.2009.08.039
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper investigates scheduling job shop problems with sequence-dependent setup times under minimization of makespan. We develop an effective metaheuristic, simulated annealing with novel operators, to potentially solve the problem. Simulated annealing is a well-recognized algorithm and historically classified as a local-search-based metaheuristic. The performance of simulated annealing critically depends on its operators and parameters, in particular, its neighborhood search structure. In this paper, we propose an effective neighborhood search structure based on insertion neighborhoods as well as analyzing the behavior of simulated annealing with different types of operators and parameters by the means of Taguchi method. An experiment based on Taillard benchmark is conducted to evaluate the proposed algorithm against some effective algorithms existing in the literature. The results show that the proposed algorithm outperforms the other algorithms. (C) 2009 Elsevier B. V. All rights reserved.
引用
收藏
页码:703 / 710
页数:8
相关论文
共 50 条
  • [31] A Matheuristic Approach to the Open Shop Scheduling Problem with Sequence-Dependent Setup Times
    Pastore, Erica
    Alfieri, Arianna
    Castiglione, Claudio
    Nicosia, Gaia
    Salassa, Fabio
    IFAC PAPERSONLINE, 2022, 55 (10): : 2167 - 2172
  • [32] A genetic algorithm for a re-entrant job-shop scheduling problem with sequence-dependent setup times
    Sun, J. U.
    ENGINEERING OPTIMIZATION, 2009, 41 (06) : 505 - 520
  • [33] Flexible job shop scheduling with sequence-dependent setup and transportation times by ant colony with reinforced pheromone relationships
    Rossi, Andrea
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 153 : 253 - 267
  • [34] A bicriteria scheduling with sequence-dependent setup times
    Eren, Tamer
    Guner, Ertan
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 179 (01) : 378 - 385
  • [35] Combining metaheuristics for the Job Shop Scheduling problem with Sequence Dependent Setup Times
    Gonzalez, Miguel A.
    Sierra, Maria R.
    Vela, Camino R.
    Varela, Ramiro
    Puente, Jorge
    SOFTWARE AND DATA TECHNOLOGIES, 2008, 10 : 348 - 360
  • [36] A new exact solution algorithm for the job shop problem with sequence-dependent setup times
    Artigues, C
    Belmokhtar, S
    Feillet, D
    INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING FOR COMBINATORIAL OPTIMIZATION PROBLEMS, 2004, 3011 : 37 - 49
  • [37] A branch and bound method for the job-shop problem with sequence-dependent setup times
    Christian Artigues
    Dominique Feillet
    Annals of Operations Research, 2008, 159 : 135 - 159
  • [38] A branch and bound method for the job-shop problem with sequence-dependent setup times
    Artigues, Christian
    Feillet, Dominique
    ANNALS OF OPERATIONS RESEARCH, 2008, 159 (01) : 135 - 159
  • [39] Dual resource constrained flexible job shop scheduling with sequence-dependent setup time
    Barak, Sasan
    Javanmard, Shima
    Moghdani, Reza
    EXPERT SYSTEMS, 2024, 41 (10)
  • [40] An approach for flexible job-shop scheduling with separable sequence-dependent setup time
    Guimaraes, Kairon Freitas
    Fernandes, Marcia Aparecida
    2006 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-6, PROCEEDINGS, 2006, : 3727 - +