Behavioural analysis of a hydroelectric production power plant under reworking scheme

被引:8
|
作者
Manglik, Monika [1 ]
Ram, Mangey [1 ]
机构
[1] Graph Era Univ, Dept Math, Dehra Dun, India
关键词
sensitivity; hydroelectric production power plant; reliability indices; electric power; Markov model; RELIABILITY-ANALYSIS; SYSTEM RELIABILITY; FAILURE; OPTIMIZATION; PERFORMANCE; GENERATION;
D O I
10.1080/00207543.2014.962114
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
By high calibre of the fundamental nature of electric power, both of our economic and personal interests, a system is expected to supply as electrical energy as possible with the highest degree of quality and reliability. This research work aimed to evaluate the reliability measures of a hydroelectric power station. The results of this study are deliberate to provide the improved criteria for upcoming proposals, and serves as a basis for generation expansion planning of hydroelectric power stations. This paper presents a Markov-process based mathematical model for a hydroelectric power plant. The important reliability measures have been derived and discussed with the help of failure and repair rates through the analysis. This research gives a clear view of how the hydropower plants are modelled by defining the states under the failure and repair rates.
引用
收藏
页码:648 / 664
页数:17
相关论文
共 50 条
  • [31] Effect of Modeling Range on Structural Analysis for Powerhouse of Hydroelectric Power Plant by FEM
    张启灵
    伍鹤皋
    杨华全
    Transactions of Tianjin University, 2009, 15 (05) : 388 - 392
  • [32] Effect of Modeling Range on Structural Analysis for Powerhouse of Hydroelectric Power Plant by FEM
    张启灵
    伍鹤皋
    杨华全
    Transactions of Tianjin University, 2009, (05) : 388 - 392
  • [33] Excitation system response analysis of the BABA Hydroelectric power plant generation units
    Chang, Rommel
    Amen, Paul
    Medina, Giovanny
    Urquizo, Javier
    2020 IEEE 29TH INTERNATIONAL SYMPOSIUM ON INDUSTRIAL ELECTRONICS (ISIE), 2020, : 851 - 856
  • [34] High Rhine power plant Rheinfelden and hydroelectric power in Germany
    Mazurkiewicz, Jacek
    eb - Elektrische Bahnen, 2011, 109 (10): : 526 - 531
  • [35] PVC PIPE PROVIDES ANSWER FOR HYDROELECTRIC POWER SCHEME
    不详
    WATER SERVICES, 1984, 88 (1055): : 18 - 18
  • [36] Performability analysis of a system under 1-out-of-2:G scheme with perfect reworking
    Mangey Ram
    Amit Kumar
    Journal of the Brazilian Society of Mechanical Sciences and Engineering, 2015, 37 : 1029 - 1038
  • [37] SUB-GLACIAL MELTWATER INTAKES UNDER BONDHUSBREEN, NORWAY, FOR HYDROELECTRIC POWER PRODUCTION
    OSTREM, G
    TRANSACTIONS-AMERICAN GEOPHYSICAL UNION, 1977, 58 (09): : 904 - 904
  • [38] Performability analysis of a system under 1-out-of-2:G scheme with perfect reworking
    Ram, Mangey
    Kumar, Amit
    JOURNAL OF THE BRAZILIAN SOCIETY OF MECHANICAL SCIENCES AND ENGINEERING, 2015, 37 (03) : 1029 - 1038
  • [39] TURBINES FOR THE SHUL'BINSK HYDROELECTRIC POWER PLANT.
    Shpilev, I.M.
    Sidorov, V.L.
    Kuz'mina, N.G.
    Soviet energy technology, 1987, (01): : 51 - 54
  • [40] Model Predictive Control for Hydroelectric Power Plant Reservoirs
    Zanoli, Silvia Maria
    Pepe, Crescenzo
    Astolfi, Giacomo
    Luzi, Francesco
    2022 23RD INTERNATIONAL CARPATHIAN CONTROL CONFERENCE (ICCC), 2022, : 331 - 336