Behavioural analysis of a hydroelectric production power plant under reworking scheme

被引:8
|
作者
Manglik, Monika [1 ]
Ram, Mangey [1 ]
机构
[1] Graph Era Univ, Dept Math, Dehra Dun, India
关键词
sensitivity; hydroelectric production power plant; reliability indices; electric power; Markov model; RELIABILITY-ANALYSIS; SYSTEM RELIABILITY; FAILURE; OPTIMIZATION; PERFORMANCE; GENERATION;
D O I
10.1080/00207543.2014.962114
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
By high calibre of the fundamental nature of electric power, both of our economic and personal interests, a system is expected to supply as electrical energy as possible with the highest degree of quality and reliability. This research work aimed to evaluate the reliability measures of a hydroelectric power station. The results of this study are deliberate to provide the improved criteria for upcoming proposals, and serves as a basis for generation expansion planning of hydroelectric power stations. This paper presents a Markov-process based mathematical model for a hydroelectric power plant. The important reliability measures have been derived and discussed with the help of failure and repair rates through the analysis. This research gives a clear view of how the hydropower plants are modelled by defining the states under the failure and repair rates.
引用
收藏
页码:648 / 664
页数:17
相关论文
共 50 条
  • [41] ANALYSIS OF A SCHEME OF POWER PLANT WITH AN MHD GENERATOR AND THERMOCOMPRESSOR
    KOVBASYUK, VI
    MEDIN, SA
    HIGH TEMPERATURE, 1968, 6 (06) : 1071 - +
  • [42] Data-mining experiments on a hydroelectric power plant
    Ohana, I.
    Bezerra, U. H.
    Vieira, J. P. A.
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2012, 6 (05) : 395 - 403
  • [43] The Impact of a Hydroelectric Power Plant on a Regional Climate in Portugal
    Fonseca, Andre
    Santos, Joao A.
    ATMOSPHERE, 2021, 12 (11)
  • [44] ON THE OPTIMAL-CONTROL OF A HYDROELECTRIC POWER-PLANT
    PHU, HX
    SYSTEMS & CONTROL LETTERS, 1987, 8 (03) : 281 - 288
  • [46] RECOVERY OF AN OXISOL DEGRADED BY THE CONSTRUCTION OF A HYDROELECTRIC POWER PLANT
    Borges de Carvalho, Joseane Carina
    Espindola, Carlos Roberto
    Alves, Marlene Cristina
    Figueiredo, Getulio Coutinho
    Falci Dechen, Sonia Carmela
    REVISTA BRASILEIRA DE CIENCIA DO SOLO, 2015, 39 (06): : 1776 - 1785
  • [47] Design of a Lever Hydroelectric Power Plant - in the Structural Aspect with a Strength Analysis of the Selected Segment
    Gwizdal, Pawel
    Gola, Arkadiusz
    ADVANCES IN SCIENCE AND TECHNOLOGY-RESEARCH JOURNAL, 2024, 18 (07) : 1 - 17
  • [48] HYDROELECTRIC POWER PLANT USING DUMP INDUSTRIAL WATER
    Orlewski, Waclaw
    Siwek, Andrzej
    RYNEK ENERGII, 2010, (06): : 87 - 91
  • [49] DESIGN AND CONSTRUCTION OF IMAICHI HYDROELECTRIC POWER PLANT.
    Fujii, Toshio
    1600, (25):
  • [50] Geodesic studies at Vilyuy hydroelectric power plant 3
    Grosbergs A.P.
    Karlson A.A.
    Hydrotechnical Construction, 2001, 35 (10) : 549 - 553