An extension of the model for the problem of workpiece scheduling in a flexible manufacturing cell

被引:1
|
作者
Teixeira, E [1 ]
Mendes, A [1 ]
机构
[1] Fundacao Ctr Tecnol Informat, Inst Automacao, BR-13081970 Campinas, SP, Brazil
关键词
flexible manufacturing cell; mathematical programming; tools; scheduling;
D O I
10.1080/095372898234398
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes an extension to the 1993 model presented by Teixeira for scheduling workpieces in a flexible manufacturing cell (FMC). In that case, Teixeira modelled the problem as a mixed-integer linear program (MILP) and introduced a robot as the transport device for the workpieces. The extension consists in considering that each job requires a set of different tools to be executed and that the FMC's central tool magazine is loaded with one tool of each type. This approach is interesting when one considers the case of tools being so expensive that it is preferable to increase the production length rather than buy additional tooling. A small example problem is solved and the resulting Gantt charts are shown.
引用
收藏
页码:176 / 180
页数:5
相关论文
共 50 条
  • [31] A METHOD OF FLEXIBLE SCHEDULING FOR FLEXIBLE MANUFACTURING SYSTEMS
    CHOI, JG
    HITOMI, K
    ECON, P
    ECON, PE
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 33 (1-3) : 247 - 255
  • [32] Extension of disjunctive graph model for job shop scheduling problem
    Blazewicz, J
    Pesch, E
    Sterna, M
    OPERATIONS RESEARCH PROCEEDINGS 2000, 2001, : 359 - +
  • [33] A NOTE ON THE PROBLEM OF SCHEDULING A FLEXIBLE MANUFACTURING SYSTEM FOR JUST-IN-TIME CUSTOMERS
    CO, HC
    ZHU, J
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (06) : 1673 - 1681
  • [34] A HIERARCHICAL SYSTEM FOR DYNAMICALLY SOLVING PLANNING AND SCHEDULING PROBLEM IN A FLEXIBLE MANUFACTURING SYSTEM
    LIU, PS
    FU, LC
    1989 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-3: CONFERENCE PROCEEDINGS, 1989, : 77 - 82
  • [35] Scheduling problem of single Machine and workpiece with time window
    Cheng, Bihui
    2018 INTERNATIONAL SEMINAR ON COMPUTER SCIENCE AND ENGINEERING TECHNOLOGY (SCSET 2018), 2019, 1176
  • [36] Collaborative algorithm of workpiece scheduling and AGV operation in flexible workshop
    Cheng, Wenlong
    Meng, Wenjun
    ROBOTIC INTELLIGENCE AND AUTOMATION, 2024, 44 (01): : 34 - 47
  • [37] A mathematical model and simulated annealing algorithm for solving the cyclic scheduling problem of a flexible robotic cell
    Nejad, Mazyar Ghadiri
    Gueden, Hueseyin
    Vizvari, Bela
    Barenji, Reza Vatankhah
    ADVANCES IN MECHANICAL ENGINEERING, 2018, 10 (01):
  • [38] Hybrid Harmony Search for the Flowline Manufacturing Cell Scheduling Problem
    Li, Yazhi
    Li, Xiaoping
    PROCEEDINGS OF THE 2014 IEEE 18TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN (CSCWD), 2014, : 214 - 219
  • [39] Design and scheduling of hybrid multi-cell flexible manufacturing systems
    Kattan, IA
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (05) : 1239 - 1257
  • [40] Design and scheduling of hybrid multi-cell flexible manufacturing systems
    Tennessee Technological Univ, Cookeville, United States
    Int J Prod Res, 5 (1239-1257):