An extension of the model for the problem of workpiece scheduling in a flexible manufacturing cell

被引:1
|
作者
Teixeira, E [1 ]
Mendes, A [1 ]
机构
[1] Fundacao Ctr Tecnol Informat, Inst Automacao, BR-13081970 Campinas, SP, Brazil
关键词
flexible manufacturing cell; mathematical programming; tools; scheduling;
D O I
10.1080/095372898234398
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes an extension to the 1993 model presented by Teixeira for scheduling workpieces in a flexible manufacturing cell (FMC). In that case, Teixeira modelled the problem as a mixed-integer linear program (MILP) and introduced a robot as the transport device for the workpieces. The extension consists in considering that each job requires a set of different tools to be executed and that the FMC's central tool magazine is loaded with one tool of each type. This approach is interesting when one considers the case of tools being so expensive that it is preferable to increase the production length rather than buy additional tooling. A small example problem is solved and the resulting Gantt charts are shown.
引用
收藏
页码:176 / 180
页数:5
相关论文
共 50 条
  • [41] Tool handling and scheduling in a two-machine flexible manufacturing cell
    Agnetis, A
    Dror, M
    Vakharia, AJ
    Rossi, F
    IIE TRANSACTIONS, 1996, 28 (05) : 425 - 437
  • [42] Petri net based control for the dynamic scheduling of a flexible manufacturing cell
    Malo-Tamayo, AJ
    Gavino-Contreras, D
    Ramirez-Trevino, A
    1998 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5, 1998, : 553 - 557
  • [43] Multi-AGV Flexible Manufacturing Cell Scheduling Considering Charging
    Li, Jianxun
    Cheng, Wenjie
    Lai, Kin Keung
    Ram, Bhagwat
    MATHEMATICS, 2022, 10 (19)
  • [44] Tool handling and scheduling in a two-machine flexible manufacturing cell
    Universita di Roma 'La Sapienza', Roma, Italy
    IIE Trans, 5 (425-437):
  • [45] Performance-based dynamic scheduling model for flexible manufacturing systems
    Buyurgan, N
    Mendoza, A
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (07) : 1273 - 1295
  • [46] Optimal Task Scheduling in a Flexible Manufacturing System using Model Checking
    Malik, Robi
    Pena, Patricia N.
    IFAC PAPERSONLINE, 2018, 51 (07): : 230 - 235
  • [47] Integrated scheduling technology of flexible manufacturing workshop based on Holon model
    Chen, Yanyun
    Zheng, Pengfei
    Academic Journal of Manufacturing Engineering, 2019, 17 (04): : 52 - 58
  • [48] An optimization model for flexible routing based flowshop scheduling problem
    Wang, Qing
    Wang, Fan
    Liu, Shu-an
    Qi, Yanhui
    PROCEEDINGS OF THE 2012 24TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2012, : 1984 - 1989
  • [49] An optimization model for cyclic scheduling problem in flexible robotic cells
    Nejad, Mazyar Ghadiri
    Kovacs, Gergely
    Vizvari, Bela
    Barenji, Reza Vatankhah
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 95 (9-12): : 3863 - 3873
  • [50] An optimization model for cyclic scheduling problem in flexible robotic cells
    Mazyar Ghadiri Nejad
    Gergely Kovács
    Béla Vizvári
    Reza Vatankhah Barenji
    The International Journal of Advanced Manufacturing Technology, 2018, 95 : 3863 - 3873