Design and scheduling of hybrid multi-cell flexible manufacturing systems

被引:6
|
作者
Kattan, IA
机构
[1] College of Engineering, Tennessee Technological University, Cookeville, TN, 38505
关键词
D O I
10.1080/002075497195308
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The objective of this paper is to minimize machine duplication by increasing its utilization, minimize intercell moves, simplify the scheduling problem and increase the flexibility of the manufacturing system. An integrated approach of design and scheduling alternative hybrid multi-cell flexible manufacturing systems (MCFMSs) in four steps will be presented in this paper. The first step is the implementation of branch and bound techniques which provide tools to design group technology (GT) cells. The second step is balancing the inter-cell workload of GT cells which leads to a hybrid MCFMS with better utilization of the machines. The problem of the exception machines and their utilization and workload balance will be solved within the MCFMS centre. Thus the performance of GT cells can be improved by transferring workloads from a congested (bottleneck) machine in one cell to an alternative one, a less congested (exception) machine in another cell within a group of GT cells forming a MCFMS centre. The third step is the group scheduling; a proposed heuristic method will be used for the scheduling of a family of parts with the objective of minimizing the maximum completion time of each part. The problem of scheduling under MCFMS can be reduced by considering the scheduling of each family of parts. Finally, the flexibility of the system will be enhanced by selecting appropriate machine tools and flexible material handling equipments. This approach is both effective and efficient-it has generated a hybrid MCFMS centre which includes several alternatives, for some benchmark problems in much shorter time than algorithms previously reported in the literature. In addition, the method is conceptually simple and easy to implement.
引用
收藏
页码:1239 / 1257
页数:19
相关论文
共 50 条
  • [1] Design and scheduling of hybrid multi-cell flexible manufacturing systems
    Tennessee Technological Univ, Cookeville, United States
    [J]. Int J Prod Res, 5 (1239-1257):
  • [2] An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system
    Das, SR
    Canel, C
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 97 (03) : 247 - 262
  • [3] A Coordinated Scheduling Strategy in Multi-Cell OFDM Systems
    Chen, Li
    Cao, Lei
    Zhang, Xin
    Yang, Dacheng
    [J]. 2010 IEEE GLOBECOM WORKSHOPS, 2010, : 1197 - 1201
  • [4] SIMULATION FOR DESIGN AND SCHEDULING OF FLEXIBLE MANUFACTURING SYSTEMS.
    Fox, Kenneth
    [J]. Technical Paper - Society of Manufacturing Engineers. MS, 1982,
  • [5] Scheduling of complex flexible manufacturing systems - Methodology design
    Katalinic, B
    Balic, J
    Pahole, I
    [J]. STROJNISKI VESTNIK-JOURNAL OF MECHANICAL ENGINEERING, 1998, 44 (5-6): : 168 - 174
  • [6] Distributed dynamic production control in a multi-cell flexible manufacturing system
    [J]. Arzi, Yohanan, 1600, Elsevier Science B.V., Amsterdam, Netherlands (52):
  • [7] Part and tool flow management in multi-cell flexible manufacturing system
    Ozbayrak, M
    Turker, AK
    Pisman, M
    [J]. PROCEEDINGS OF THE 1997 WINTER SIMULATION CONFERENCE, 1997, : 809 - 816
  • [8] A hybrid heuristic search algorithm for scheduling flexible manufacturing systems
    Xiong, HH
    Zhou, MC
    Caudill, RJ
    [J]. 1996 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, PROCEEDINGS, VOLS 1-4, 1996, : 2793 - 2797
  • [9] Coordinated User Scheduling for Multi-Cell Distributed Antenna Systems
    Wang, Yanmin
    Feng, Wei
    Li, Yunzhou
    Zhou, Shidong
    Wang, Jing
    [J]. 2011 IEEE GLOBAL TELECOMMUNICATIONS CONFERENCE (GLOBECOM 2011), 2011,
  • [10] On scheduling of flexible manufacturing systems
    Wu, Xiqi
    Lou, Tong
    [J]. Wuhan Gongye Daxue Xuebao/Journal of Wuhan University of Technology, 1995, 17 (02):