Assessing Understanding of Planning and Scheduling Theory and Practice on Construction Projects

被引:28
|
作者
AlNasseri, Hammad [1 ]
Aulin, Radhlinah [2 ]
机构
[1] Lund Univ, S-22100 Lund, Sweden
[2] Lund Univ, Div Construct Management, S-22100 Lund, Sweden
关键词
Construction Projects; Organizational Learning; Project Planning; Schedule Performance; Scheduling Methods; Stakeholder Perspectives; MANAGEMENT; KNOWLEDGE; PERFORMANCE; INTEGRATION; SYSTEMS; COST; RISK;
D O I
10.1080/10429247.2015.1035963
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Despite attention being paid to the development of planning and scheduling theory, it is unclear whether project stakeholders and practitioners have sufficient understanding about how it applies in practice. A study was conducted with the aim of assessing practitioners' perceptions of planning and scheduling theory and practice on construction projects in Oman. Data were gathered through a questionnaire-based survey and analyzed using the relative importance index. Respondents were asked to consider: (1) the suitability and efficiency of existing planning methods; (2) scheduling development and performance control; and (3) knowledge-based planning and scheduling concepts. The analysis revealed no significant variations among respondents' perceptions in regard to the above topics. The findings did, however, reveal a number of factors that are of equal importance to the development of project planning and scheduling. The overall findings imply that practicing managers should implement new management strategies that foster knowledge-based planning and scheduling concepts for a more effective construction process. Recommendations are made for improvement that include the need for practicing managers to professionalize project planning and scheduling based on a more proactive and knowledge-based planning approach, which is supported by management.
引用
收藏
页码:58 / 72
页数:15
相关论文
共 50 条
  • [31] Scheduling of construction projects by means of evolutionary algorithms
    Rogalska, Magdalena
    Bozejko, Ciech
    Hejducki, Zdzislaw
    9TH INTERNATIONAL CONFERENCE: MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, VOLS 1-3, 2008, : 360 - +
  • [32] AN INTEGRATED INTELLIGENT SYSTEM FOR SCHEDULING CONSTRUCTION PROJECTS
    SOH, CK
    PHANG, KW
    WONG, WP
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1995, 108 (01) : 36 - 37
  • [33] Investigating the Use of ChatGPT for the Scheduling of Construction Projects
    Prieto, Samuel A.
    Mengiste, Eyob T.
    de Soto, Borja Garcia
    BUILDINGS, 2023, 13 (04)
  • [34] AN INTEGRATED INTELLIGENT SYSTEM FOR SCHEDULING CONSTRUCTION PROJECTS
    SOH, CK
    PHANG, KW
    WONG, WP
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1993, 97 (04) : 156 - 162
  • [35] Heavy Equipment Scheduling for Horizontal Construction Projects
    Gurcanli, G. Emre
    Turkoglu, Harun
    Bilir, Senem
    7TH INTERNATIONAL CONFERENCE ON ENGINEERING, PROJECT, AND PRODUCTION MANAGEMENT, 2017, 182 : 265 - 273
  • [36] Modeling scheduling uncertainty in capital construction projects
    Boskers, ND
    AbouRizk, SM
    PROCEEDINGS OF THE 2005 WINTER SIMULATION CONFERENCE, VOLS 1-4, 2005, : 1500 - 1507
  • [37] Fuzzy Linear and Repetitive Scheduling for Construction Projects
    Katsuragawa, Clara Mariana
    Lucko, Gunnar
    Isaac, Shabtai
    Su, Yi
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (03)
  • [38] Scheduling construction projects using evolutionary algorithm
    Jaskowski, Piotr
    Sobotka, Anna
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2006, 132 (08): : 861 - 870
  • [39] Effective progress scheduling and control for construction projects
    Tavakoli, Amir
    Journal of Management in Engineering, 1990, 6 (01) : 87 - 98
  • [40] ASSESSING THE SUSTAINABILITY OF CONSTRUCTION PROJECTS USING DEMPSTER-SHAFER (DS) THEORY OF EVIDENCE
    Aghbolaghi, Hamideh Asadi
    Aghbolaghi, Faezeh Asadi
    ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2024, 23 (02): : 273 - 286