AN INTEGRATED INTELLIGENT SYSTEM FOR SCHEDULING CONSTRUCTION PROJECTS

被引:0
|
作者
SOH, CK
PHANG, KW
WONG, WP
机构
关键词
11;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Existing project planning tools for construction programmes have many inherent limitations, such as the need for manual input of data, constant training in planning skills and the lack of means to accumulate expertise. An 'intelligent' construction scheduling advisor, CICONSA, has been conceived and developed to take advantage of state-of-the-art expert system techniques, a popular relational database management system, dBase III, and an established project management system, Hornet. This Paper describes the prototype to illustrate the use of expert system and data-base technologies to overcome such limitations and an illustrative example is presented.
引用
收藏
页码:156 / 162
页数:7
相关论文
共 50 条
  • [1] AN INTEGRATED INTELLIGENT SYSTEM FOR SCHEDULING CONSTRUCTION PROJECTS
    SOH, CK
    PHANG, KW
    WONG, WP
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1995, 108 (01) : 36 - 37
  • [2] Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects
    Schatteman, Damien
    Herroelen, Willy
    Van de Vonder, Stijn
    Boone, Anton
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (11) : 885 - 893
  • [3] Scheduling of Construction Projects
    Bozejko, Wojciech
    Wodecki, Mieczyslaw
    PROCEEDINGS OF THE 6TH EUROPEAN CONFERENCE ON MANAGEMENT LEADERSHIP AND GOVERNANCE, 2010, : 64 - 72
  • [4] INTEGRATED MANAGEMENT-SYSTEM FOR CONSTRUCTION PROJECTS
    KOUSKOULAS, V
    GRAZIOLI, M
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1977, 103 (01): : 101 - 112
  • [5] An Intelligent System for Cost Data Handling in Construction Projects
    Martinez-Rojas, Maria
    Marin, Nicolas
    Molina, Carlos
    Amparo Vila, Ma
    2016 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS (FUZZ-IEEE), 2016, : 359 - 366
  • [6] Intelligent Materials Tracking System for Construction Projects Management
    Kasim, Narimah
    JOURNAL OF ENGINEERING AND TECHNOLOGICAL SCIENCES, 2015, 47 (02): : 218 - 230
  • [7] CONSCHED - EXPERT SYSTEM FOR SCHEDULING OF MODULAR CONSTRUCTION PROJECTS
    SHAKED, O
    WARSZAWSKI, A
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (03): : 488 - 506
  • [8] Research and Application of an Intelligent Integrated Planning and Scheduling System
    Lv Zhimin
    Xu Jinwu
    Zhang Xuejun
    Fan Haitao
    PROCEEDINGS OF THE 2009 WRI GLOBAL CONGRESS ON INTELLIGENT SYSTEMS, VOL II, 2009, : 567 - 571
  • [9] An intelligent integrated scheduling model for flexible manufacturing system
    Sankar, SS
    Ponnambalam, SG
    2004 IEEE CONFERENCE ON ROBOTICS, AUTOMATION AND MECHATRONICS, VOLS 1 AND 2, 2004, : 1095 - 1100
  • [10] Integrated intelligent planning and scheduling in the construction material supply chain environment
    Udeaja, C
    Tah, J
    CONSTRUCTION INNOVATION AND GLOBAL COMPETITIVENESS, VOLS 1 AND 2: THE ORGANIZATION AND MANAGEMENT OF CONSTRUCTION, 2003, : 626 - 639