AN INTEGRATED INTELLIGENT SYSTEM FOR SCHEDULING CONSTRUCTION PROJECTS

被引:0
|
作者
SOH, CK
PHANG, KW
WONG, WP
机构
关键词
11;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Existing project planning tools for construction programmes have many inherent limitations, such as the need for manual input of data, constant training in planning skills and the lack of means to accumulate expertise. An 'intelligent' construction scheduling advisor, CICONSA, has been conceived and developed to take advantage of state-of-the-art expert system techniques, a popular relational database management system, dBase III, and an established project management system, Hornet. This Paper describes the prototype to illustrate the use of expert system and data-base technologies to overcome such limitations and an illustrative example is presented.
引用
收藏
页码:156 / 162
页数:7
相关论文
共 50 条
  • [41] Towards an integrated management system in infrastructure construction projects: a survey of practitioners in China
    Fu Chun
    He Man
    Zhang Fei-lian
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 1090 - 1095
  • [42] Survey of the construction industry relative to the use of CPM scheduling for construction projects
    Galloway, Patricia D.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (07) : 697 - 711
  • [43] The relationship between integrated design and construction and safety on construction projects
    Atkinson, Andrew R.
    Westall, Rebecca
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (09) : 1007 - 1017
  • [44] Segmentation and Repetitive Scheduling of Linear Continuous Construction Projects
    Moos, Michael
    Velten, Sebastian
    Weiss, Christian
    OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 134 - 140
  • [45] Use of genetic algorithms in resource scheduling of construction projects
    Senouci, AB
    Eldin, NN
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (06): : 869 - 877
  • [46] Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm
    Xie, Linlin
    Chen, Yajiao
    Chang, Ruidong
    APPLIED SCIENCES-BASEL, 2021, 11 (12):
  • [47] A Fixed Start Scheduling Approach for Repetitive Construction Projects
    Francisco Moreno
    Francisco Orozco
    Omar Rojas
    Bolivar Senior
    Mani Poshdar
    Eric Forcael
    KSCE Journal of Civil Engineering, 2020, 24 : 1671 - 1682
  • [48] Efficient method for scheduling construction projects with resource constraints
    Abeyasinghe, M.Chelaka L.
    Greenwood, David J.
    Johansen, D.Eric
    2001, Elsevier Science Ltd, Exeter, United Kingdom (19)
  • [49] Collaborative supply chain planning and scheduling of construction projects
    Elmughrabi, Walid
    Ben Sassi, Oumaima
    Dao, Thien-My
    Chabaane, Amin
    IFAC PAPERSONLINE, 2020, 53 (02): : 10761 - 10766
  • [50] SCHEDULING REPETITIVE CONSTRUCTION PROJECTS: STRUCTURED LITERATURE REVIEW
    Tomczak, Michal
    Jaskowski, Piotr
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2022, 28 (06) : 422 - 442