Operation model for split runcard automation in 300mm environment

被引:0
|
作者
Liu, ACP [1 ]
Gong, HM [1 ]
Lin, WY [1 ]
Hsu, SHJ [1 ]
机构
[1] Taiwan Semicond Mfg Co, Hsinchu 30077, Taiwan
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Split RUNCARD operation is positioned to be a manual operation on semiconductor environment for a long time; Not only equipment is in manual mode, further more, it is impossible for FAB users to trace lot related information. "Operation Model for Split RUNCARD Automation" is an operation reference model that describe the principle of how to create an add-on CIM system to enable MES supporting split RUNCARD event, especially for the 300mm equipment's auto mode.
引用
收藏
页码:123 / 125
页数:3
相关论文
共 50 条
  • [1] 300mm is reshaping the factory automation market
    Castellano, RN
    [J]. SOLID STATE TECHNOLOGY, 2002, 45 (02) : 38 - +
  • [2] An automation route to upgrading fabs toward 300mm
    Brain, M
    [J]. SOLID STATE TECHNOLOGY, 2000, 43 (10) : 69 - +
  • [3] 300mm fab automation technology options and selection criteria
    Weiss, M
    [J]. 1997 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP - ASMC 97 PROCEEDINGS: THEME - THE QUEST FOR SEMICONDUCTOR MANUFACTURING EXCELLENCE: LEADING THE CHARGE INTO THE 21ST CENTURY, 1997, : 373 - 379
  • [4] 300mm full automation integration test methodology and experience
    Wang, M
    Chang, E
    Liu, J
    [J]. 2002 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS I-IV, PROCEEDINGS, 2002, : 3613 - 3618
  • [5] New tools and fabs demand 300mm automation optimization
    Bonora, A
    Feindel, D
    [J]. SOLID STATE TECHNOLOGY, 2001, 44 (06) : 87 - +
  • [6] Improvement of 300mm FOUP mini-environment
    Seita, H
    Fujii, A
    Suzuki, T
    Kimoto, S
    Shippou, O
    Fujiwara, K
    Tokunaga, K
    [J]. 2001 IEEE INTERNATIONAL SYMPOSIUM ON SEMICONDUCTOR MANUFACTURING, CONFERENCE PROCEEDINGS, 2001, : 503 - 506
  • [7] 300mm factory automation experience and challenges for wafer foundry fabs
    Hung, CH
    Lin, LR
    [J]. 2001 IEEE INTERNATIONAL SYMPOSIUM ON SEMICONDUCTOR MANUFACTURING, CONFERENCE PROCEEDINGS, 2001, : 377 - 380
  • [8] Simulation analysis of 300mm intrabay automation vehicle capacity alternatives
    Mackulak, GT
    Lawrence, FP
    Rayter, J
    [J]. ASMC 98 PROCEEDINGS - 1998 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP: THEME - SEMICONDUCTOR MANUFACTURING: MEETING THE CHALLENGES OF THE GLOBAL MARKETPLACE, 1998, : 445 - 450
  • [9] Current state of 300mm lithography in a pilot line environment
    Charles, AB
    Maltabes, JG
    Hornig, SR
    Schedel, T
    Ganz, D
    Schmidt, S
    Grant, L
    Hraschan, G
    Mautz, KE
    Otto, R
    [J]. PROCESS, EQUIPMENT, AND MATERIALS CONTROL IN INTEGRATED CIRCUIT MANUFACTURING V, 1999, 3882 : 140 - 153
  • [10] Factory automation migration experience for foundry Fab from 200mm to 300mm
    Lin, LR
    Chu, HL
    Hung, CH
    Lee, YC
    Yeh, PC
    [J]. 2002 SEMICONDUCTOR MANUFACTURING TECHNOLOGY WORKSHOP, 2002, : 278 - 281