300mm factory automation experience and challenges for wafer foundry fabs

被引:0
|
作者
Hung, CH
Lin, LR
机构
关键词
D O I
10.1109/ISSM.2001.962994
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
As the semiconductor industry increases interest in 300 nun wafer size transition, Taiwan Semiconductor Manufacturing Company (TSMC) also participates the 300 min development and mass production. TSMC uses a pilot line of 4.5 K monthly output capacity to gain process and tool expertise and to develop appropriate 300 mm factory automation know-how for the set-up of the next several mass production 300 mm Fabs. The goal is to achieve or exceed the current 200 mm foundry sen,ice, which offers leading edge technology, good on-time delivery, and excellent product quality for 300 mm Fabs. A lot of experience has been learned and sonic challenges have been identified after operating this 300 mm pilot line for one year. These learned experience and challenges are discussed in this paper.
引用
收藏
页码:377 / 380
页数:4
相关论文
共 50 条
  • [1] Factory automation migration experience for foundry Fab from 200mm to 300mm
    Lin, LR
    Chu, HL
    Hung, CH
    Lee, YC
    Yeh, PC
    [J]. 2002 SEMICONDUCTOR MANUFACTURING TECHNOLOGY WORKSHOP, 2002, : 278 - 281
  • [2] An automation route to upgrading fabs toward 300mm
    Brain, M
    [J]. SOLID STATE TECHNOLOGY, 2000, 43 (10) : 69 - +
  • [3] 300mm is reshaping the factory automation market
    Castellano, RN
    [J]. SOLID STATE TECHNOLOGY, 2002, 45 (02) : 38 - +
  • [4] New tools and fabs demand 300mm automation optimization
    Bonora, A
    Feindel, D
    [J]. SOLID STATE TECHNOLOGY, 2001, 44 (06) : 87 - +
  • [5] The challenges of macro integration for fully automated 300mm fabs
    Chase, M
    Scott, D
    Nestel-Patt, K
    [J]. SOLID STATE TECHNOLOGY, 2000, 43 (10) : 52 - +
  • [6] Process, environmental & economical considerations to implement single wafer cleaning tools in 300mm wafer fabs
    Garnier, P
    Horellou, G
    Calvier, JJ
    Labaty, D
    Lévy, D
    [J]. ULTRA CLEAN PROCESSING OF SILICON SURFACES VII, 2005, 103-104 : 41 - 44
  • [7] A high-fidelity, Web-based simulator for 300mm wafer fabs
    Kim, H
    Park, J
    Sohn, S
    Wang, Y
    Reveliotis, S
    Zhou, C
    Bodner, D
    McGinnis, L
    [J]. 2001 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5: E-SYSTEMS AND E-MAN FOR CYBERNETICS IN CYBERSPACE, 2002, : 1288 - 1293
  • [8] Contamination control in 300mm foundry
    Hsu, HJ
    Chen, IC
    Jann, L
    [J]. 2002 SEMICONDUCTOR MANUFACTURING TECHNOLOGY WORKSHOP, 2002, : 212 - 214
  • [9] 300mm full automation integration test methodology and experience
    Wang, M
    Chang, E
    Liu, J
    [J]. 2002 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS I-IV, PROCEEDINGS, 2002, : 3613 - 3618
  • [10] Effective OHT dispatching for differentiated material handling services in 300mm wafer foundry
    Wang, CN
    Liao, DY
    [J]. 2003 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-3, PROCEEDINGS, 2003, : 1027 - 1032