A cloud based job sequencing with sequence-dependent setup for sheet metal manufacturing

被引:22
|
作者
Ahmadov, Yashar [1 ]
Helo, Petri [1 ]
机构
[1] Univ Vaasa, Networked Value Syst, Dept Prod, POB 700, Vaasa 65101, Finland
关键词
Big data analytics; Sequence-dependent setup; Heuristics; Job scheduling; BIG DATA; CHANGEOVER TIMES; UP TIMES; SYSTEM;
D O I
10.1007/s10479-016-2304-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a prototype system of sheet metal processing machinery which collects production order data, passes current information to cloud based centralized job scheduling for setup time reduction and updates the production calendar accordingly. A centralized cloud service can collect and analyse production order data for machines and suggest optimized schedules. This paper explores the application of sequencing algorithms in the sheet metal forming industry, which faces sequence-dependent changeover times on single machine systems. We analyse the effectiveness of using such algorithms in the reduction of total setup times. We describe alternative models: Clustering, Nearest Neighbourhood and Travelling Salesman Problem, and then apply them to real data obtained from a manufacturing company, as well as to randomly generated data sets. Based on the prototype implementation clustering algorithm was proposed for actual implementation. Sequence-dependency increases the complexity of the scheduling problems; thus, effective approaches are required to solve them. The algorithms proposed in this paper provide efficient solutions to these types of sequencing problems.
引用
收藏
页码:5 / 24
页数:20
相关论文
共 50 条
  • [31] An approach for flexible job-shop scheduling with separable sequence-dependent setup time
    Guimaraes, Kairon Freitas
    Fernandes, Marcia Aparecida
    2006 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-6, PROCEEDINGS, 2006, : 3727 - +
  • [32] Performance analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times: Simulation approach
    Sharma, Pankaj
    Jain, Ajai
    CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY, 2015, 10 : 110 - 119
  • [33] Order release and sequence-dependent setup times
    Missbauer, H
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 49 (02) : 131 - 143
  • [34] A bicriteria scheduling with sequence-dependent setup times
    Eren, Tamer
    Guner, Ertan
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 179 (01) : 378 - 385
  • [35] SCHEDULING POLICIES IN MULTI-PRODUCT MANUFACTURING SYSTEMS WITH SEQUENCE-DEPENDENT SETUP TIMES
    Feng, Wei
    Zheng, Li
    Li, Jingshan
    PROCEEDINGS OF THE 2011 WINTER SIMULATION CONFERENCE (WSC), 2011, : 2050 - 2061
  • [36] Constraint based local search for flowshops with sequence-dependent setup times
    Riahi, Vahid
    Newton, M. A. Hakim
    Sattar, Abdul
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2021, 102
  • [37] Study on job shop scheduling with sequence-dependent setup times using biological immune algorithm
    Zhou, Yaqin
    Li, Beizhi
    Yang, Jianguo
    International Journal of Advanced Manufacturing Technology, 2006, 30 (1-2): : 105 - 111
  • [38] Study on job shop scheduling with sequence-dependent setup times using biological immune algorithm
    Zhou, Yaqin
    Li, Beizhi
    Yang, Jianguo
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 30 (1-2): : 105 - 111
  • [39] Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates
    Lin, Shih-Wei
    Lee, Zne-Jung
    Ying, Kuo-Ching
    Lu, Chung-Cheng
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (05) : 809 - 815
  • [40] Dynamic job-shop scheduling with sequence-dependent setup times: Simulation modeling and analysis
    Vinod, V.
    Sridharan, R.
    International Journal of Advanced Manufacturing Technology, 2008, 36 (3-4): : 355 - 372