SCHEDULING POLICIES IN MULTI-PRODUCT MANUFACTURING SYSTEMS WITH SEQUENCE-DEPENDENT SETUP TIMES

被引:0
|
作者
Feng, Wei [1 ]
Zheng, Li [1 ]
Li, Jingshan [2 ]
机构
[1] Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
[2] Univ Wisconsin Madison, Dept Syst & Ind Engn, Madison, WI 53706 USA
基金
中国国家自然科学基金;
关键词
LOST SALES; PERFORMANCE EVALUATION; KANBAN SYSTEMS;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Multi-product production systems with sequence-dependent setup times are typical in manufacturing of semiconductor chips and other electronic products. In such systems, the scheduling policies to coordinate the production of multiple product types play an important role. In this paper, we study a multi-product manufacturing system with finite buffers, sequence-dependent setup times and various scheduling policies. Using continuous time Markov chain models, we evaluate the performance of such systems under seven scheduling policies, i.e., cyclic, shortest queue, shortest processing time, shortest overall time (including setup time and processing time), longest queue, longest processing time, and longest overall time. The impact of these policies on system throughput are compared, and the conditions characterizing the superiority of each policy are investigated. The results of this work can provide production engineers and supervisors practical guidance to operate multi-product manufacturing systems with sequence-dependent setups.
引用
收藏
页码:2050 / 2061
页数:12
相关论文
共 50 条
  • [1] Scheduling policies in multi-product manufacturing systems with sequence-dependent setup times and finite buffers
    Feng, Wei
    Zheng, Li
    Li, Jingshan
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (24) : 7479 - 7492
  • [2] The robustness of scheduling policies in multi-product manufacturing systems with sequence-dependent setup times and finite buffers
    Feng, Wei
    Zheng, Li
    Li, Jingshan
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (04) : 1145 - 1153
  • [3] The Robustness of Scheduling Policies in Multi-product Manufacturing Systems with Sequence-dependent Setup Times and Finite Buffers
    Feng, Wei
    Zheng, Li
    Li, Jingshan
    [J]. 2012 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION (ICRA), 2012, : 5074 - 5079
  • [4] A bicriteria scheduling with sequence-dependent setup times
    Eren, Tamer
    Guner, Ertan
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2006, 179 (01) : 378 - 385
  • [5] Scheduling multi-colour print jobs with sequence-dependent setup times
    Burger, A. P.
    Jacobs, C. G.
    van Vuuren, J. H.
    Visagie, S. E.
    [J]. JOURNAL OF SCHEDULING, 2015, 18 (02) : 131 - 145
  • [6] Scheduling multi-colour print jobs with sequence-dependent setup times
    A. P. Burger
    C. G. Jacobs
    J. H. van Vuuren
    S. E. Visagie
    [J]. Journal of Scheduling, 2015, 18 : 131 - 145
  • [7] Concurrent scheduling of manufacturing cells considering sequence-dependent family setup times and intercellular transportation times
    Kourosh Halat
    Reza Bashirzadeh
    [J]. The International Journal of Advanced Manufacturing Technology, 2015, 77 : 1907 - 1915
  • [8] Concurrent scheduling of manufacturing cells considering sequence-dependent family setup times and intercellular transportation times
    Halat, Kourosh
    Bashirzadeh, Reza
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 77 (9-12): : 1907 - 1915
  • [9] Permutation flowshops in group scheduling with sequence-dependent setup times
    Naderi, B.
    Salmasi, Nasser
    [J]. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2012, 6 (02) : 177 - 198
  • [10] A genetic algorithm for the batch scheduling with sequence-dependent setup times
    Chen, TsiuShuang
    Long, Lei
    Fung, Richard Y. K.
    [J]. INTELLIGENT COMPUTING IN SIGNAL PROCESSING AND PATTERN RECOGNITION, 2006, 345 : 1137 - 1144