Causes, Implications, and Strategies for Project Closeout Delays in Highway Construction

被引:7
|
作者
Tummalapudi, Manideep [1 ]
Harper, Christofer M. [1 ]
Taylor, Timothy R. B. [2 ]
Waddle, Steve [3 ]
Catchings, Rachel [3 ]
机构
[1] Colorado State Univ, Dept Construct Management, Ft Collins, CO 80523 USA
[2] Univ Kentucky, Dept Civil Engn, Lexington, KY USA
[3] Kentucky Transportat Ctr, Lexington, KY USA
关键词
infrastructure; construction; construction management; project close-out;
D O I
10.1177/03611981221087229
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In highway construction, completing projects on time is critical. However, when projects are not completed on time, one of the aspects that is often neglected by the state departments of transportation (DOTs), which causes delays in highway construction, is project closeout. The project closeout phase, if delayed, not only has consequences for transportation agencies and contractors, but also leads to substantial social costs to the public. Despite the potential magnitude of the impact, there is limited knowledge about the factors that cause project closeout delays or about strategies for timely highway construction project closeouts. This study identified the causes that delay highway project closeouts, raises awareness of the implications of delays, and provides recommendations for efficient highway project closeout practices. The research methodology included an extensive literature review, a survey questionnaire (40 state DOTs participating), and case studies of eight state DOTs. The results showed that difficulties in attaining the required documentation, claims and litigations, managing multiple funding sources, a lack of urgency from local utilities/entities, and the lack of sufficient DOT project staff are major factors that delay project closeout. When a highway construction project is not closed out in a timely manner, the DOT can be subject to additional costs, obsolete funding sources, loss of project documentation, loss of staff with project knowledge (through retirement/attrition), and potential adverse impacts on internal and external relationships. The authors provide recommendations for state DOTs to mitigate closeout delays and help ensure timely finalization of highway construction projects.
引用
收藏
页码:479 / 490
页数:12
相关论文
共 50 条
  • [1] Causes of Delay on Highway Construction Project in Klang Valley
    Karunakaran, S.
    Ramli, M. Z.
    Malek, M. A.
    Musir, A. A.
    Imran, N. F.
    Fuad, N. F. S. M.
    Zawawi, M. H.
    Zainal, M. Z.
    GREEN DESIGN AND MANUFACTURE: ADVANCED AND EMERGING APPLICATIONS, 2018, 2030
  • [2] Causes of delays in construction project for developing Southeast Asia countries
    Wuala, H. D.
    Rarasati, A. D.
    INTERNATIONAL CONFERENCE ON INNOVATION IN ENGINEERING AND VOCATIONAL EDUCATION 2019 (ICIEVE 2019), PTS 1-4, 2020, 830
  • [3] Exploring Causes of Delays in National Road and Highway Projects in Developing Construction Economy
    Karimi S.
    Piroozfar P.
    Journal of Engineering, Project, and Production Management, 2022, 12 (02) : 137 - 148
  • [4] Identification of Causes and Minimization of Delays in Highway Projects of Pakistan
    Sohu, Samiullah
    Chandio, Abdul Fattah
    Kaleemullah
    MEHRAN UNIVERSITY RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY, 2019, 38 (01) : 103 - 112
  • [5] Shakwak highway project - Construction challenges
    Walsh, R
    MacLeod, D
    Cook, D
    COLD REGIONS ENGINEERING: THE COLD REGIONS INFRASTRUCTURE: AN INTERNATIONAL IMPERATIVE FOR THE 21ST CENTURY, 1996, : 640 - 651
  • [6] CAUSES OF DELAYS IN CONSTRUCTION PROJECTS IN TURKEY
    Kazaz, Aynur
    Ulubeyli, Serdar
    Tuncbilekli, Nihan Avcioglu
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (03) : 426 - 435
  • [7] Major Causes Assessment of Construction Delays
    Umar A.A.
    Rizeiqi R.K.A.
    Badr A.
    Umar, Abdullahi Ahmed (abdulproject@yahoo.com), 1600, De Gruyter Open Ltd (10): : 179 - 186
  • [8] Construction projects: interactions of the causes of delays
    Purushothaman, Mahesh Babu
    San Pedro, Leo Neil Resurreccion
    GhaffarianHoseini, Ali
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2024,
  • [9] Delays in construction projects - Causes and impacts
    Arantes, Amlcar
    da Silva, Pedro Fernandez
    Ferreira, Luis Miguel D. F.
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 1105 - 1110
  • [10] CAUSES OF DELAYS IN IRANIAN CONSTRUCTION PROJECTS
    Khoshgoftar, Mohammad
    Abu Bakar, Abu Hassan
    Osman, Omar
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2010, 10 (02) : 53 - 69