Planning for Mining Operations with Time and Resource Constraints

被引:0
|
作者
Lipovetzky, Nir [1 ]
Burt, Christina N. [1 ]
Pearce, Adrian R. [1 ]
Stuckey, Peter J. [1 ]
机构
[1] Univ Melbourne, Comp & Informat Syst, Parkville, Vic, Australia
基金
澳大利亚研究理事会;
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
We study a daily mine planning problem where, given a set of blocks we wish to mine, our task is to generate a mining sequence for the excavators such that blending resource constraints are met at various stages of the sequence. Such time-oriented resource constraints are not traditionally handled well by automated planners. On the other hand, the remaining problem involves finding node-disjoint sequences with state-dependent travel times on the arcs, which are highly challenging for a Mixed-Integer Program (MIP). In this paper, we address the problem of finding feasible sequences using a combined MIP and planning based decomposition approach. The MIP takes care of the resource constraints, and the planner solves the remaining sequence problem. We extend the notion of finding feasible sequences to finding good feasible sequences, by devising a heuristic objective function in the MIP, which improves the resulting search space for the planner. We empirically analyse the scalability of our approach on a benchmark data set, before demonstrating its effectiveness on a real world case study provided by our industry partner. These results demonstrate that by using a heuristic MIP, it is possible to obtain better makespan results with a suboptimal planner than by using an optimal planner with an uninformed MIP.
引用
收藏
页码:404 / 412
页数:9
相关论文
共 50 条
  • [41] Bus Operations Scheduling Subject to Resource Constraints Using Evolutionary Optimization
    Gkiotsalitis, Konstantinos
    Kumar, Rahul
    INFORMATICS-BASEL, 2018, 5 (01):
  • [42] Resource Scheduling for Mobility Scenarios with Time Constraints
    Petri, Marcelo
    Kniess, Janine
    Parpinelli, Rafael Stubs
    2018 XLIV LATIN AMERICAN COMPUTER CONFERENCE (CLEI 2018), 2018, : 184 - 191
  • [43] Fair Resource Allocation with Varying Time Constraints
    Ramanath, Sreenath
    Altman, Eitan
    2018 10TH INTERNATIONAL CONFERENCE ON COMMUNICATION SYSTEMS & NETWORKS (COMSNETS), 2018, : 432 - 434
  • [44] PREEMPTIVE SCHEDULING UNDER TIME AND RESOURCE CONSTRAINTS
    ZHAO, W
    RAMAMRITHAM, K
    STANKOVIC, JA
    IEEE TRANSACTIONS ON COMPUTERS, 1987, 36 (08) : 949 - 960
  • [45] Optimization of drayage operations with time-window constraints
    Shiri, Samaneh
    Huynh, Nathan
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2016, 176 : 7 - 20
  • [46] RadMonitor: Radiology Operations Data Mining in Real Time
    Richard Chen
    Pattanasak Mongkolwat
    David S. Channin
    Journal of Digital Imaging, 2008, 21 : 257 - 268
  • [47] Space-Time Cube Operations in Process Mining
    Bayomie, Dina
    Pfahlsberger, Lukas
    Revoredo, Kate
    Mendling, Jan
    PRACTICE OF ENTERPRISE MODELING, POEM 2020, 2020, 400 : 405 - 414
  • [48] A Planning Model for Flexible-Route Bus Operations with Financial Constraints
    Dajeong Han
    M. Edward Kim
    Eungcheol Kim
    KSCE Journal of Civil Engineering, 2022, 26 : 3114 - 3135
  • [49] Enterprise resource planning, operations and management Enabling and constraining ERP and the role of the production and operations manager
    Hald, Kim Sundtoft
    Mouritsen, Jan
    INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2013, 33 (08) : 1075 - 1104
  • [50] Optimal simulation-based operations planning with quantitative safety constraints
    Asprey, SP
    Batres, R
    Fuchino, T
    Naka, Y
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1999, 38 (06) : 2364 - 2374