Planning for Mining Operations with Time and Resource Constraints

被引:0
|
作者
Lipovetzky, Nir [1 ]
Burt, Christina N. [1 ]
Pearce, Adrian R. [1 ]
Stuckey, Peter J. [1 ]
机构
[1] Univ Melbourne, Comp & Informat Syst, Parkville, Vic, Australia
基金
澳大利亚研究理事会;
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
We study a daily mine planning problem where, given a set of blocks we wish to mine, our task is to generate a mining sequence for the excavators such that blending resource constraints are met at various stages of the sequence. Such time-oriented resource constraints are not traditionally handled well by automated planners. On the other hand, the remaining problem involves finding node-disjoint sequences with state-dependent travel times on the arcs, which are highly challenging for a Mixed-Integer Program (MIP). In this paper, we address the problem of finding feasible sequences using a combined MIP and planning based decomposition approach. The MIP takes care of the resource constraints, and the planner solves the remaining sequence problem. We extend the notion of finding feasible sequences to finding good feasible sequences, by devising a heuristic objective function in the MIP, which improves the resulting search space for the planner. We empirically analyse the scalability of our approach on a benchmark data set, before demonstrating its effectiveness on a real world case study provided by our industry partner. These results demonstrate that by using a heuristic MIP, it is possible to obtain better makespan results with a suboptimal planner than by using an optimal planner with an uninformed MIP.
引用
收藏
页码:404 / 412
页数:9
相关论文
共 50 条
  • [21] Group planning with time constraints
    Hadad, Meirav
    Kraus, Sarit
    Hartman, Irith Ben-Arroyo
    Rosenfeld, Avi
    ANNALS OF MATHEMATICS AND ARTIFICIAL INTELLIGENCE, 2013, 69 (03) : 243 - 291
  • [22] Group planning with time constraints
    Meirav Hadad
    Sarit Kraus
    Irith Ben-Arroyo Hartman
    Avi Rosenfeld
    Annals of Mathematics and Artificial Intelligence, 2013, 69 : 243 - 291
  • [23] The study of coal mining resource planning system
    Zhuang, YL
    PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, 2000, : 350 - 354
  • [24] Are diplomatic, information, and economic resource planning consistent with military planning for operations?
    Christensson, S. Anders
    Cornwallis Group X: Analysis for New and Emerging Societal Conflicts, 2006, 10 : 108 - 121
  • [25] Extended time constraints for sequence mining
    Fiot, Ciline
    Laurent, Anne
    Teisseire, Maguelonne
    TIME 2007: 14TH INTERNATIONAL SYMPOSIUM ON TEMPORAL REPRESENTATION AND REASONING, PROCEEDINGS, 2007, : 105 - +
  • [26] DIGITALIZATION AND THE POTENTIAL FOR IMPROVING THE DESIGN AND PLANNING OF MINING OPERATIONS IN OPEN CAST MINING
    Galiyev, S. Zh
    Dovzhenok, A. S.
    Ga, A. D. Kol
    Galiyev, D. A.
    Uteshov, E. T.
    NEWS OF THE NATIONAL ACADEMY OF SCIENCES OF THE REPUBLIC OF KAZAKHSTAN-SERIES OF GEOLOGY AND TECHNICAL SCIENCES, 2020, (01): : 146 - 154
  • [27] Access planning and resource coordination for clinical research operations
    Deglise-Hawkinson, Jivan
    Kaufman, David L.
    Roessler, Blake
    Van Oyen, Mark P.
    IISE TRANSACTIONS, 2020, 52 (08) : 832 - 849
  • [28] Enterprise resource planning (ERP): The dynamics of operations management
    Kerbache, L
    INTERFACES, 2002, 32 (01) : 104 - 105
  • [29] Choosing Wisely in a time of resource constraints
    Born, Karen B.
    Levinson, Wendy
    Pramesh, C. S.
    Kerr, Eve A.
    BMJ-BRITISH MEDICAL JOURNAL, 2024, 385
  • [30] A multiobjective operations planning model with unit commitment and transmission constraints
    Chattopadhyay, D
    Momoh, J
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (03) : 1078 - 1084