Bus Operations Scheduling Subject to Resource Constraints Using Evolutionary Optimization

被引:8
|
作者
Gkiotsalitis, Konstantinos [1 ]
Kumar, Rahul [1 ,2 ]
机构
[1] NEC Labs Europe, D-69115 Heidelberg, Germany
[2] Kurfuersten Anlage 36, D-69115 Heidelberg, Germany
来源
INFORMATICS-BASEL | 2018年 / 5卷 / 01期
关键词
bus bunching; evolutionary optimization; constrained optimization; service reliability;
D O I
10.3390/informatics5010009
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In public transport operations, vehicles tend to bunch together due to the instability of passenger demand and traffic conditions. Fluctuation of the expected waiting times of passengers at bus stops due to bus bunching is perceived as service unreliability and degrades the overall quality of service. For assessing the performance of high-frequency bus services, transportation authorities monitor the daily operations via Transit Management Systems (TMS) that collect vehicle positioning information in near real-time. This work explores the potential of using Automated Vehicle Location (AVL) data from the running vehicles for generating bus schedules that improve the service reliability and conform to various regulatory constraints. The computer-aided generation of optimal bus schedules is a tedious task due to the nonlinear and multi-variable nature of the bus scheduling problem. For this reason, this work develops a two-level approach where (i) the regulatory constraints are satisfied and (ii) the waiting times of passengers are optimized with the introduction of an evolutionary algorithm. This work also discusses the experimental results from the implementation of such an approach in a bi-directional bus line operated by a major bus operator in northern Europe.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] Robust timetable optimization for bus lines subject to resource and regulatory constraints
    Gkiotsalitis, K.
    Alesiani, F.
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2019, 128 : 30 - 51
  • [2] Optimization of Electric Bus Scheduling Considering Charging Station Resource Constraints
    Zhang, Mingye
    Yang, Min
    Li, Yu
    Huang, Shiyu
    TRANSPORTATION RESEARCH RECORD, 2024, 2678 (03) : 13 - 23
  • [3] SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY
    BLAZEWICZ, J
    LENSTRA, JK
    KAN, AHGR
    DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) : 11 - 24
  • [4] Parallel machine scheduling subject to auxiliary resource constraints
    Cakici, E.
    Mason, S. J.
    PRODUCTION PLANNING & CONTROL, 2007, 18 (03) : 217 - 225
  • [5] A Data-Driven Approach for Scheduling Bus Services Subject to Demand Constraints
    Brahmanage, Janaka Chathuranga
    Kandappu, Thivya
    Zheng, Baihua
    IEEE TRANSACTIONS ON KNOWLEDGE AND DATA ENGINEERING, 2023, 35 (07) : 6534 - 6547
  • [6] Scheduling Optimization of Prefabricated Buildings under Resource Constraints
    He, Wei
    Li, Wenjing
    Meng, Xiaofeng
    KSCE JOURNAL OF CIVIL ENGINEERING, 2021, 25 (12) : 4507 - 4519
  • [7] Scheduling Optimization of Prefabricated Buildings under Resource Constraints
    Wei He
    Wenjing Li
    Xiaofeng Meng
    KSCE Journal of Civil Engineering, 2021, 25 : 4507 - 4519
  • [8] OPTIMIZATION IN BUS SCHEDULING - DRIVER CONSTRAINTS DEADHEADING ESTIMATION AND SIZE ADVANTAGE
    FUCHS, C
    LECTURE NOTES IN ECONOMICS AND MATHEMATICAL SYSTEMS, 1992, 386 : 197 - 212
  • [9] Comparison of Multiobjective Evolutionary Algorithms for Operations Scheduling under Machine Availability Constraints
    Frutos, M.
    Mendez, M.
    Tohme, F.
    Broz, D.
    SCIENTIFIC WORLD JOURNAL, 2013,
  • [10] Particle Swarm Optimization for Preemptive Project Scheduling with Resource Constraints
    Li, Fei
    Lai, Changtao
    Shou, Yongyi
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 869 - 873