Hazard Identification, Risk Analysis and Risk Assessment on High-Rise Building Construction Project

被引:4
|
作者
Ratnaningsih, Anik [1 ]
Dhokhikah, Yeny [1 ]
Fitria, Anisa [1 ]
机构
[1] Univ Jember, Fac Engn, Dept Civil Engn, Jember Regency, Indonesia
来源
HUMAN-DEDICATED SUSTAINABLE PRODUCT AND PROCESS DESIGN: MATERIALS, RESOURCES, AND ENERGY | 2018年 / 1977卷
关键词
D O I
10.1063/1.5042870
中图分类号
O4 [物理学];
学科分类号
0702 ;
摘要
High-Rise Building (HRB) construction project has complicated the structural design, complexity of work and potential risks in project work. Project risk can obstruct the project activities and achievement. The objectives of this paper are to identify the risks of technical and construction management, allocate the risk to appropriate parties, namely owner, contractor, and shared (owner and contractor), and assign the risk response to dominant risk in the HRB project. Identification of risk was conducted through literature study and validation of the preliminary survey. The risks analysis based on the results of main survey was carried out with severity index method combined with matrix of impact probability. The dominant risks were allocated to the contractor, owner and shared. The results showed that there are eight risks in time impact and seven risks in cost impact from 35 variables of risk. The main impact to time and cost is the low level of productivity.
引用
收藏
页数:9
相关论文
共 50 条
  • [21] Multi-hazard performance assessment of a transfer-plate high-rise building
    Xiangming Zhou
    Y. L. Xu
    Earthquake Engineering and Engineering Vibration, 2007, 6 : 371 - 382
  • [22] Multi-hazard performance assessment of a transfer-plate high-rise building
    Zhou, Xiangmin
    Xu, Y. L.
    EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION, 2007, 6 (04) : 371 - 382
  • [23] Visibility and dominance analysis: assessing a high-rise building project in Trondheim
    Rod, Jan Ketil
    van der Meer, Diana
    ENVIRONMENT AND PLANNING B-PLANNING & DESIGN, 2009, 36 (04): : 698 - 710
  • [24] Risk assessment and ranking methodology for occupational hazards in construction: a case of Indian high-rise projects
    Tripathi, Pooja
    Mittal, Yash Kumar
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2024,
  • [25] Fire risk assessment of high-rise buildings under construction based on unascertained measure theory
    Li, Wenlong
    Li, Huimin
    Liu, Yijun
    Wang, Sunmeng
    Pei, Xingwang
    Li, Qian
    PLOS ONE, 2020, 15 (09):
  • [26] Patent analysis for forecasting promising technology in high-rise building construction
    Cho, Han Pil
    Lim, Hyunsu
    Lee, Dongmin
    Cho, Hunhee
    Kang, Kyung-In
    TECHNOLOGICAL FORECASTING AND SOCIAL CHANGE, 2018, 128 : 144 - 153
  • [27] ENVIRONMENTAL IMPACT ASSESSMENT IN THE WHOLE PROCESS OF SUPER HIGH-RISE BUILDING CONSTRUCTION
    Fang, Liwei
    FRESENIUS ENVIRONMENTAL BULLETIN, 2021, 30 (6B): : 7923 - 7932
  • [28] An investigation of fall accident in a high-rise building project
    Arifuddin, R.
    Latief, R. U.
    Suraji, A.
    3RD INTERNATIONAL CONFERENCE ON CIVIL AND ENVIRONMENTAL ENGINEERING (ICCEE 2019), 2020, 419
  • [29] Probabilistic multi-hazard risk assessment of high-rise buildings subjected to concurrent earthquakes and strong winds
    Yu, Qian-Qian
    Liu, Ling-Han
    Gu, Xiang-Lin
    Zhang, Yao-Yao
    ENGINEERING STRUCTURES, 2025, 331
  • [30] The Construction of High-Rise Building Fire Escape Scene
    Qin, Hua
    Gao, Xiao-Tong
    PROCEEDINGS OF THE 20TH CONGRESS OF THE INTERNATIONAL ERGONOMICS ASSOCIATION (IEA 2018), VOL V: HUMAN SIMULATION AND VIRTUAL ENVIRONMENTS, WORK WITH COMPUTING SYSTEMS (WWCS), PROCESS CONTROL, 2019, 822 : 189 - 194