Hazard Identification, Risk Analysis and Risk Assessment on High-Rise Building Construction Project

被引:4
|
作者
Ratnaningsih, Anik [1 ]
Dhokhikah, Yeny [1 ]
Fitria, Anisa [1 ]
机构
[1] Univ Jember, Fac Engn, Dept Civil Engn, Jember Regency, Indonesia
关键词
D O I
10.1063/1.5042870
中图分类号
O4 [物理学];
学科分类号
0702 ;
摘要
High-Rise Building (HRB) construction project has complicated the structural design, complexity of work and potential risks in project work. Project risk can obstruct the project activities and achievement. The objectives of this paper are to identify the risks of technical and construction management, allocate the risk to appropriate parties, namely owner, contractor, and shared (owner and contractor), and assign the risk response to dominant risk in the HRB project. Identification of risk was conducted through literature study and validation of the preliminary survey. The risks analysis based on the results of main survey was carried out with severity index method combined with matrix of impact probability. The dominant risks were allocated to the contractor, owner and shared. The results showed that there are eight risks in time impact and seven risks in cost impact from 35 variables of risk. The main impact to time and cost is the low level of productivity.
引用
收藏
页数:9
相关论文
共 50 条
  • [41] Quality Risk Perception of Rectification and Reinforcement in a High-Rise Building under Uncertainty
    Bu, Liangtao
    Yue, Hui
    BUILDINGS, 2024, 14 (03)
  • [42] PROBABILISTIC SEISMIC DEMAND MODELS AND RISK ASSESSMENT FOR HIGH-RISE BUILDINGS
    Zheng, Xiao-Wei
    Li, Hong-Nan
    Zhang, Ying-Ying
    Yin, Shi-Ping
    Gongcheng Lixue/Engineering Mechanics, 2022, 39 (09): : 31 - 39
  • [43] Identification and Ranking of Factors Affecting the Delay Risk of High-Rise Construction Projects Using AHP and VIKOR Methods
    Nikbakht, Mehran Vahedi
    Gheibi, Mohammad
    Montazeri, Hassan
    Khaksar, Reza Yeganeh
    Moezzi, Reza
    Vadiee, Amir
    INFRASTRUCTURES, 2024, 9 (02)
  • [44] Probabilistic seismic assessment of a high-rise URM building
    Avila-Haro, J. A.
    Gonzalez-Drigo, R.
    Vargas-Alzate, Y. F.
    Pujades, L.
    Barbat, A.
    JOURNAL OF BUILDING ENGINEERING, 2022, 45
  • [45] Regional High-Rise Building Fire Risk Assessment Based on the Spatial Markov Chain Model and an Indicator System
    Zhang, Yan
    Wang, Guru
    Wang, Xuehui
    Kong, Xin
    Jia, Hongchen
    Zhao, Jinlong
    FIRE-SWITZERLAND, 2024, 7 (01):
  • [46] Air infiltration induced inter-unit dispersion and infectious risk assessment in a high-rise residential building
    Yan Wu
    Jianlei Niu
    Xiaoping Liu
    Building Simulation, 2018, 11 : 193 - 202
  • [47] Fire Risk Factor Analysis of High-Rise Building Based on Bayesian Network and Fuzzy Fault Tree
    Dong, Penghui
    Wang, Sanming
    CONFERENCE PROCEEDINGS OF 2019 5TH INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION AND ROBOTICS (ICCAR), 2019, : 599 - 603
  • [48] Integrated Model for Assessment of High-Rise Building Locations
    Tamosaitiene, Jolanta
    Gaudutis, Ernestas
    Kracka, Modestas
    MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, 2013, 57 : 1151 - 1155
  • [49] Air infiltration induced inter-unit dispersion and infectious risk assessment in a high-rise residential building
    Wu, Yan
    Niu, Jianlei
    Liu, Xiaoping
    BUILDING SIMULATION, 2018, 11 (01) : 193 - 202
  • [50] Influence of shrinkage and creep on high-rise building in construction process
    Deng, Zhi-Heng
    Qin, Rong
    Harbin Jianzhu Daxue Xuebao/Journal of Harbin University of Civil Engineering and Architecture, 2002, 35 (05): : 28 - 31