The life-cycle information management practice of Shanghai Yangtze River Tunnel and Bridge Project

被引:0
|
作者
Tian, H. Y. [1 ]
Liu, Q. W. [1 ]
机构
[1] Shanghai Changjiang Tunnel & Bridge Dev Co Ltd, Shanghai, Peoples R China
关键词
tunneling; ShanghaiYangtze River Tunnel; life-cycle information management; project information management; construction information systems; operation information management;
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
ShanghaiYangtze River Tunnel & Bridge Project is an extra-large transportation infrastructure project that, and is an important part of the express way from Shanghai to Xi'an. The total length of the project is 25.5 km long, within which the length of the tunnel is 8.95 km long (the length of river-crossing is 7.5 km), and the length of the bridge is 16.63 km (the length of river-crossing is 9.97 km). There are many difficulties of a huge river-crossing project, such as large scale, large investment, long construction period, complex technologies, multi-parties involved, high risk, difficult exestuation and long site locations etc. Then information management has become the effective method for construction and operation management for such a project. For this reason, overall life-cycle information management was set as the target, the project information management system, construction information management system, operation information management system are established to effectively manage all the information from project management, design, construction and operation of such an extra-large project, that have effectively improved the efficiency and quality of the construction and operation of the ShanghaiYangtze River Tunnel & Bridge Project.
引用
收藏
页码:2157 / 2162
页数:6
相关论文
共 50 条
  • [1] Life-cycle Integrated Management Information System of construction project
    Huang Ang
    He Qinghua
    Le Yun
    Hu Yi
    Li Yongkui
    [J]. Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 489 - 494
  • [2] Design of the Whole Life-cycle Information Management Mechanism of Project
    Zhang Yani
    [J]. MECHATRONICS ENGINEERING, COMPUTING AND INFORMATION TECHNOLOGY, 2014, 556-562 : 6544 - 6547
  • [3] Life-cycle Integrated Management Information System (LMIS) of construction project
    He, QH
    [J]. ADVANCES IN BUILDING TECHNOLOGY, VOLS I AND II, PROCEEDINGS, 2002, : 1535 - 1542
  • [4] Integration of Life-Cycle Cost Analysis with Bridge Management Systems Case Study of Swedish Bridge and Tunnel Management System
    Safi, Mohammed
    Sundquist, Hakan
    Karoumi, Raid
    Racutanu, George
    [J]. TRANSPORTATION RESEARCH RECORD, 2012, (2292) : 125 - 133
  • [5] An information model for life-cycle cost management of cable-stayed bridge
    Lee, S. H.
    Huang, M. G.
    Kim, B. G.
    Park, Y. H.
    [J]. LIFE-CYCLE CIVIL ENGINEERING, 2008, : 825 - 828
  • [6] A Framework for BIM-enabled Life-cycle Information Management of Construction Project
    Xu, Xun
    Ma, Ling
    Ding, Lieyun
    [J]. INTERNATIONAL JOURNAL OF ADVANCED ROBOTIC SYSTEMS, 2014, 11
  • [7] Synthesis of a model for life-cycle project management
    Jaafari, A
    Manivong, K
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2000, 15 (01) : 26 - 38
  • [9] Network bridge management with life-cycle cost optimization
    Almeida, J. O.
    Delgado, R. M.
    Teixeira, P. F.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 2674 - 2681
  • [10] Bridge Safety, Maintenance and Management in a Life-Cycle Context
    Balakumaran, Soundar
    Frangopol, Dan M.
    Kim, Sunyong
    [J]. JOURNAL OF BRIDGE ENGINEERING, 2023, 28 (09)