The life-cycle information management practice of Shanghai Yangtze River Tunnel and Bridge Project

被引:0
|
作者
Tian, H. Y. [1 ]
Liu, Q. W. [1 ]
机构
[1] Shanghai Changjiang Tunnel & Bridge Dev Co Ltd, Shanghai, Peoples R China
关键词
tunneling; ShanghaiYangtze River Tunnel; life-cycle information management; project information management; construction information systems; operation information management;
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
ShanghaiYangtze River Tunnel & Bridge Project is an extra-large transportation infrastructure project that, and is an important part of the express way from Shanghai to Xi'an. The total length of the project is 25.5 km long, within which the length of the tunnel is 8.95 km long (the length of river-crossing is 7.5 km), and the length of the bridge is 16.63 km (the length of river-crossing is 9.97 km). There are many difficulties of a huge river-crossing project, such as large scale, large investment, long construction period, complex technologies, multi-parties involved, high risk, difficult exestuation and long site locations etc. Then information management has become the effective method for construction and operation management for such a project. For this reason, overall life-cycle information management was set as the target, the project information management system, construction information management system, operation information management system are established to effectively manage all the information from project management, design, construction and operation of such an extra-large project, that have effectively improved the efficiency and quality of the construction and operation of the ShanghaiYangtze River Tunnel & Bridge Project.
引用
收藏
页码:2157 / 2162
页数:6
相关论文
共 50 条
  • [11] Information technology for life-cycle in infrastructure management
    Feeser, LJ
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2001, 15 (01) : 3 - 3
  • [12] Cognizance of visual design management in life-cycle project management
    Chaaya, M
    Jaafari, A
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2001, 17 (01) : 49 - 57
  • [13] Bridge life-cycle management in the service of the Finnish Road Administration
    Airaksinen, Matti
    Soderqvist, Marja-Kaarina
    [J]. LIFE-CYCLE COST AND PERFORMANCE OF CIVIL INFRASTRUCTURE SYSTEMS, 2007, : 71 - 78
  • [14] Bridge management system based on Life-Cycle Cost minimization
    Furuta, H.
    Kameda, T.
    [J]. LIFE-CYCLE COST AND PERFORMANCE OF CIVIL INFRASTRUCTURE SYSTEMS, 2007, : 149 - 156
  • [15] Life-cycle management of information and decisions for system analyses
    Reich, Y
    [J]. MECHANICAL SYSTEMS AND SIGNAL PROCESSING, 2001, 15 (03) : 513 - 527
  • [16] Life-cycle management of smart substation configuration information
    [J]. Zhang, Peichao, 1600, Automation of Electric Power Systems Press
  • [17] Proposal of a construct for information management in the agent life-cycle
    Silva, Sergio Evangelista
    Ribeiro, Filipe Nunes
    Borges Garcia, Joao Alexandre
    Peixoto de Amorim, Vicente Jose
    Camarda, Rafael Ferreira
    [J]. PERSPECTIVAS EM CIENCIA DA INFORMACAO, 2019, 24 (02): : 14 - 34
  • [18] Overviews on Internet Information Life-cycle Management Model
    Jia, Qiuning
    Guo, Shuhang
    [J]. 2011 INTERNATIONAL CONFERENCE ON FUTURE COMPUTER SCIENCE AND APPLICATION (FCSA 2011), VOL 3, 2011, : 427 - 431
  • [19] Life-cycle Management Research in Power Grid Construction Project
    Liu Jinsen
    Li Lijuan
    Lu Sibin
    Zhang Yan
    [J]. INTERNATIONAL JOURNAL OF GRID AND DISTRIBUTED COMPUTING, 2016, 9 (09): : 93 - 102
  • [20] Study on the Construction Project Life-cycle Integrated Management System
    Wang Jiu-yan
    Su Yi-kun
    Tian Jin-xin
    [J]. 2009 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (16TH), VOLS I AND II, CONFERENCE PROCEEDINGS, 2009, : 1976 - +