Integration of Life-Cycle Cost Analysis with Bridge Management Systems Case Study of Swedish Bridge and Tunnel Management System

被引:3
|
作者
Safi, Mohammed [1 ]
Sundquist, Hakan [1 ]
Karoumi, Raid [1 ]
Racutanu, George [2 ]
机构
[1] Royal Inst Technol, Div Struct Engn & Bridges, SE-10044 Stockholm, Sweden
[2] Swedish Transport Adm, S-63180 Eskilstuna, Sweden
关键词
D O I
10.3141/2292-15
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Many countries use bridge management systems (BMSs), and many of these systems involve some form of life-cycle cost (LCC) analysis. Use of LCC analysis in bridge engineering is rare, however; the technique has been applied primarily in the operation phase to support decisions about bridges that already exist. Yet LCC analysis can be applied across the life of a bridge. This paper introduces the Swedish Bridge and Tunnel Management System (BaTMan). A comprehensive, integrated LCC implementation scheme takes into account the bridge investment and management processes in Sweden. The basic economic analytical tools as well as other helpful LCC analysis techniques are described. A case study demonstrates improvements in BaTMan as a factor in the decision whether to repair or to replace a bridge. Cost records for 1,987 bridges were used as input data in the case study. On the basis of the same records, the average real and anticipated initial costs of various bridge types in Sweden are presented schematically.
引用
收藏
页码:125 / 133
页数:9
相关论文
共 50 条
  • [1] Bridge management system based on Life-Cycle Cost minimization
    Furuta, H.
    Kameda, T.
    [J]. LIFE-CYCLE COST AND PERFORMANCE OF CIVIL INFRASTRUCTURE SYSTEMS, 2007, : 149 - 156
  • [2] Optimal integration of life-cycle cost and structural reliability in bridge management
    Frangopol, DM
    [J]. PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON COMPUTING IN CIVIL AND BUILDING ENGINEERING, VOLS 1-4, 1997, : 557 - 564
  • [3] Cost-Efficient Procurement of Bridge Infrastructures by Incorporating Life-Cycle Cost Analysis with Bridge Management Systems
    Safi, Mohammed
    Sundquist, Hakan
    Karoumi, Raid
    [J]. JOURNAL OF BRIDGE ENGINEERING, 2015, 20 (06)
  • [4] Network bridge management with life-cycle cost optimization
    Almeida, J. O.
    Delgado, R. M.
    Teixeira, P. F.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 2674 - 2681
  • [5] Bridge deck management system with integrated life-cycle cost optimization
    Hegazy, T
    Elbeltagi, E
    El-Behairy, H
    [J]. MAINTENANCE AND MANAGEMENT OF PAVEMENT AND STRUCTURES, 2004, (1866): : 44 - 50
  • [6] Optimal bridge management based on lifetime reliability and life-cycle cost
    Frangopol, DM
    Estes, AC
    Augusti, G
    Ciampoli, M
    [J]. OPTIMAL PERFORMANCE OF CIVIL INFRASTRUCTURE SYSTEMS, 1998, : 98 - 115
  • [7] Development of life-cycle analysis based new bridge management system in Korea
    Sun, J. -W.
    Park, K. -H.
    Lee, S. -Y.
    Song, J. -J.
    Kong, J. -S.
    Yong, H.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 2254 - 2261
  • [8] Integration of structural health monitoring in a system performance based life-cycle bridge management framework
    Okasha, Nader M.
    Frangopol, Dan M.
    [J]. STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2012, 8 (11) : 999 - 1016
  • [9] Developing a life-cycle based management system for bridge disaster prevention
    Sung, Y. C.
    Chen, C. C.
    Hung, H. H.
    Liu, K. Y.
    Lai, M. C.
    Hsu, C. C.
    Chang, K. C.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 1098 - 1103
  • [10] An information model for life-cycle cost management of cable-stayed bridge
    Lee, S. H.
    Huang, M. G.
    Kim, B. G.
    Park, Y. H.
    [J]. LIFE-CYCLE CIVIL ENGINEERING, 2008, : 825 - 828