共 50 条
- [41] Life-cycle cost analysis of a low-volume road bridge alternative [J]. FIFTH INTERNATIONAL BRIDGE ENGINEERING CONFERENCE, VOLS 1 AND 2: BRIDGES, OTHER STRUCTURES, AND HYDRAULICS AND HYDROLOGY, 2000, 1696 : A8 - A13
- [43] Bridge life-cycle performance and cost: Analysis, prediction, optimization and decision making [J]. MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 3 - 20
- [45] Bridge management strategy for a steel plate girder bridge based on minimum total life cycle cost [J]. HEALTH MONITORING AND MANAGEMENT OF CIVIL INFRASTRUCTURE SYSTEMS, 2001, 4337 : 194 - 202
- [47] Integration of bridge management systems (BMS) and pavement management systems (PMS) [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 1095 - 1102
- [49] Uncertainty analysis and impact on seismic life-cycle cost assessment of highway bridge structures [J]. LIFE-CYCLE ANALYSIS AND ASSESSMENT IN CIVIL ENGINEERING: TOWARDS AN INTEGRATED VISION, 2019, : 923 - 930
- [50] User cost model for bridge management systems [J]. MAINTENANCE AND MANAGEMENT OF BRIDGES AND PAVEMENTS: MAINTENANCE, 2000, (1697): : 6 - 13