Cost-Efficient Procurement of Bridge Infrastructures by Incorporating Life-Cycle Cost Analysis with Bridge Management Systems

被引:21
|
作者
Safi, Mohammed [1 ,2 ,3 ,4 ]
Sundquist, Hakan [5 ]
Karoumi, Raid [5 ]
机构
[1] FOLKBRO, S-16477 Stockholm, Sweden
[2] AF Infrastruct AB, SE-10462 Stockholm, Sweden
[3] KTH Royal Inst Technol, SE-10044 Stockholm, Sweden
[4] Swedish Transport Adm, Stockholm, Sweden
[5] KTH Royal Inst Technol, Div Struct Engn & Bridges, SE-10044 Stockholm, Sweden
关键词
Bridge; Life-cycle cost analysis (LCCA); Procurement; Tender; Contract; Bridge management systems (BMSs); Repair; Added-value; Infrastructure;
D O I
10.1061/(ASCE)BE.1943-5592.0000673
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Life-cycle cost analysis (LCCA) has recognized potential for rationalizing bridge procurement, but its use in this context is far from systematic. The integration of LCCA findings in decisions is often far from robust. Furthermore, although most bridge management systems (BMSs) include databases of relevant information, agencies do not use them effectively to improve future bridge-investment decisions. This paper introduces a comprehensive approach to help agencies exploit their BMSs to procure the most cost-efficient bridge design through fair design-build (D-B) tendering processes. The approach incorporates use of a novel LCCA technique, LCC added-value analysis, that can be conveniently integrated with public agencies' established procurement procedures and maintains contractors' freedoms in D-B processes. The proposed approach allows bridge procurers to establish monetary LCC-efficient benchmarks and embed them in tender documents as core specifications. Hence the lowest LCC bid, rather than the lowest bid in initial investment terms, can be used as the contract award criterion. The Swedish Transport Administration has recently procured several bridges using the approach, thereby gaining considerable cost savings. A case study provides insights into various aspects of bridges' LCC and illustrates analytical steps that other agencies could apply in bridge procurement. The study shows that the use of D-B processes, together with the lowest LCC bid as the contract award criterion, afford greater opportunities to consider LCC aspects in bridge procurement, rather than relying on traditional contracts and the lowest-bid criterion.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] Network bridge management with life-cycle cost optimization
    Almeida, J. O.
    Delgado, R. M.
    Teixeira, P. F.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 2674 - 2681
  • [2] Integration of Life-Cycle Cost Analysis with Bridge Management Systems Case Study of Swedish Bridge and Tunnel Management System
    Safi, Mohammed
    Sundquist, Hakan
    Karoumi, Raid
    Racutanu, George
    [J]. TRANSPORTATION RESEARCH RECORD, 2012, (2292) : 125 - 133
  • [3] LIFE-CYCLE SAFETY AND COST ANALYSIS OF RC BRIDGE
    Zeng-zhong, Wang
    Li-chu, Fan
    [J]. ADVANCES IN CONCRETE STRUCTURAL DURABILITY, PROCEEDINGS OF ICDCS2008, VOLS 1 AND 2, 2008, : 1103 - 1107
  • [4] Bridge management system based on Life-Cycle Cost minimization
    Furuta, H.
    Kameda, T.
    [J]. LIFE-CYCLE COST AND PERFORMANCE OF CIVIL INFRASTRUCTURE SYSTEMS, 2007, : 149 - 156
  • [5] Innovation in bridge life-cycle cost assessment
    Macek, Daniel
    Snizek, Vaclav
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 441 - 446
  • [6] A bridge life-cycle cost optimization methodology
    Almeida, J. O.
    Delgado, R. M.
    Teixeira, P. F.
    [J]. LIFE-CYCLE OF ENGINEERING SYSTEMS: EMPHASIS ON SUSTAINABLE CIVIL INFRASTRUCTURE, 2017, : 1103 - 1110
  • [7] Life-cycle and total cost analysis of bridge expansion joints
    Savioz, P.
    Spuler, T.
    Moor, G.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 2433 - 2440
  • [8] Life-Cycle Cost analysis in bridge structures: Focused on superstructure
    Kang, Jihoon
    Lee, Seunghoon
    Hong, Taehoon
    Koo, Kyo-Jin
    Hyun, Chang-Taek
    Lee, Duheon
    [J]. LIFE-CYCLE COST AND PERFORMANCE OF CIVIL INFRASTRUCTURE SYSTEMS, 2007, : 191 - 198
  • [9] LIFE-CYCLE COST PROCUREMENT OF SYSTEMS AND SPARES
    DICKINSON, DB
    SESSEN, L
    [J]. PROCEEDINGS ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1976, (NSYM): : 282 - 286
  • [10] Optimal integration of life-cycle cost and structural reliability in bridge management
    Frangopol, DM
    [J]. PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON COMPUTING IN CIVIL AND BUILDING ENGINEERING, VOLS 1-4, 1997, : 557 - 564