Life-cycle and total cost analysis of bridge expansion joints

被引:0
|
作者
Savioz, P. [1 ]
Spuler, T. [2 ]
Moor, G. [2 ]
机构
[1] Mageba, Shanghai, Peoples R China
[2] Mageba SA, Bulach, Switzerland
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The consequences of inadequate consideration of the long-term performance of a bridge's expansion joints, and of their exchangeability when the time inevitably comes to replace them, can be severe. A high-quality, properly selected and designed joint may provide good service for 40 years or more, while a cheaper alternative, selected primarily with a view to minimising short-term construction costs, is likely to require replacement much earlier. Maintenance and repair effort during this shorter service life are also likely to be higher. And the cost of maintenance and replacement works, considering both direct costs and the indirect costs to society of disruption to traffic, may amount to many times the initial saving in purchase costs of the original expansion joint. Recognition of this can help minimise the life-cycle costs of a bridge's expansion joints for the benefit of owners, users and society.
引用
收藏
页码:2433 / 2440
页数:8
相关论文
共 50 条
  • [1] Life Cycle Cost Analysis of Deteriorated Bridge Expansion Joints
    Kelly, Aura Lee
    Atadero, Rebecca A.
    Mahmoud, Hussam N.
    [J]. PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2019, 24 (01)
  • [2] LIFE-CYCLE SAFETY AND COST ANALYSIS OF RC BRIDGE
    Zeng-zhong, Wang
    Li-chu, Fan
    [J]. ADVANCES IN CONCRETE STRUCTURAL DURABILITY, PROCEEDINGS OF ICDCS2008, VOLS 1 AND 2, 2008, : 1103 - 1107
  • [3] Total life-cycle cost
    Smith, DK
    [J]. DURABILITY OF BUILDING MATERIALS AND COMPONENTS 8, VOLS 1-4, PROCEEDINGS, 1999, : 1787 - 1797
  • [4] ANALYSIS OF TOTAL LIFE-CYCLE COST FOR CONSUMER DURABLES
    BRIGGS, W
    DEWOLFE, B
    LUND, R
    [J]. OPERATIONS RESEARCH, 1975, 23 : B353 - B353
  • [5] Life-Cycle Cost analysis in bridge structures: Focused on superstructure
    Kang, Jihoon
    Lee, Seunghoon
    Hong, Taehoon
    Koo, Kyo-Jin
    Hyun, Chang-Taek
    Lee, Duheon
    [J]. LIFE-CYCLE COST AND PERFORMANCE OF CIVIL INFRASTRUCTURE SYSTEMS, 2007, : 191 - 198
  • [6] Integrated Life-Cycle Assessment and Life-Cycle Cost Analysis Model for Concrete Bridge Deck Applications
    Kendall, Alissa
    Keoleian, Gregory A.
    Helfand, Gloria E.
    [J]. JOURNAL OF INFRASTRUCTURE SYSTEMS, 2008, 14 (03) : 214 - 222
  • [7] Critical factors in minimizing total life cycle costs of bridge expansion joints
    Pope, G.
    Creighton, J.
    Ghodke, V. V.
    [J]. MAINTENANCE, SAFETY, RISK, MANAGEMENT AND LIFE-CYCLE PERFORMANCE OF BRIDGES, 2018, : 2294 - 2301
  • [8] MODELING TOTAL LIFE-CYCLE COST
    BHADURY, B
    BASU, SK
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART A-JOURNAL OF POWER AND ENERGY, 1986, 200 (01) : 31 - 40
  • [9] Innovation in bridge life-cycle cost assessment
    Macek, Daniel
    Snizek, Vaclav
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 441 - 446
  • [10] A bridge life-cycle cost optimization methodology
    Almeida, J. O.
    Delgado, R. M.
    Teixeira, P. F.
    [J]. LIFE-CYCLE OF ENGINEERING SYSTEMS: EMPHASIS ON SUSTAINABLE CIVIL INFRASTRUCTURE, 2017, : 1103 - 1110