An application of WASPAS method in risk qualitative analysis: a case study of a road construction project in Iran

被引:41
|
作者
Badalpur, Mohammadreza [1 ]
Nurbakhsh, Ehsan [2 ]
机构
[1] Azad Univ, Tehran South Branch, Tehran, Iran
[2] Azad Univ, Tehran North Branch, Tehran, Iran
关键词
Risk assessment; risk qualitative analysis; road construction project; WASPAS method; FUZZY AHP; MANAGEMENT; SELECTION; PRICE; MODEL;
D O I
10.1080/15623599.2019.1595354
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Today, the focus on risks and uncertain events is one of the essential goals of any organization. If hazards are not taken into consideration at the planning stage it could be dangerous during project life cycle. Therefore, risk assessment is so important which has been extensively investigated by many researchers in recent years. This research suggested a method based on a combination of two WSM models (weighted sum model) and WPM (weighted product model), known as the weighted aggregated sum product assessment (WASPAS) method which was employed to assess negative effects of risks on project. This method has capability and more accuracy compared to independent methods in alternatives ranking. The WASPAS method is one of the new multi-index decision-making techniques which has been adopted and employed in many areas. In this research, we identified and evaluated the risks of a road construction project in Iran which the results showed inaccessibility/inappropriate of barrow pits, loss of key manpower during project life cycle, employing inexperienced subcontractors are of the most important risks among identified risks. Also this paper suggested the WASPAS method as a suitable method with more accuracy among MCDM techniques for evaluating of risks in a real situation.
引用
收藏
页码:910 / 918
页数:9
相关论文
共 50 条
  • [1] Identification and assessment of risk in construction projects using the integrated FMEA-SWARA-WASPAS model under fuzzy environment: a case study of a construction project in Iran
    Alvand, Abolfazl
    Mirhosseini, S. Mohammad
    Ehsanifar, Mohammad
    Zeighami, Ehsanollah
    Mohammadi, Amir
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (03) : 392 - 404
  • [2] Accurate estimation of cost and time utilizing risk analysis and simulation (case study: road construction projects in Iran)
    Arjroody, Abdorreza Rezaee
    Hosseini, Seyed Azim
    Akhbari, Mahdieh
    Safa, Ebrahim
    Asadpour, Jafar
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (01) : 19 - 30
  • [3] AHP-BASED ANALYSIS OF THE RISK ASSESSMENT DELAY CASE STUDY OF PUBLIC ROAD CONSTRUCTION PROJECT: AN EMPIRICAL STUDY
    Razi, P. Z.
    Ali, M., I
    Ramli, N., I
    JOURNAL OF ENGINEERING SCIENCE AND TECHNOLOGY, 2019, 14 (02) : 875 - 891
  • [4] Application of reinforcement learning for integrating project risk analysis and risk response planning: A case study on construction projects
    Soltan, Sajad
    Ashrafi, Maryam
    JOURNAL OF PROJECT MANAGEMENT, 2025, 10 (01) : 71 - 86
  • [5] Application of project risk management and performance indices in the construction sector: a case study
    Ciaramella, Andrea
    TECHNE-JOURNAL OF TECHNOLOGY FOR ARCHITECTURE AND ENVIRONMENT, 2013, 6 : 100 - 108
  • [6] The Application of Precedence chart in the Construction Project Risk Analysis
    Guo, Li
    He, Baizhou
    Liu, Yingguo
    Luo, Guangqiang
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE OF MANAGEMENT ENGINEERING AND INFORMATION TECHNOLOGY, VOLS 1 AND 2, 2009, : 416 - 419
  • [7] Risk analysis method for project duration of highways during construction period and its application
    Han, Shang-Yu
    Li, Hong
    Hong, Bao-Ning
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2013, 35 (SUPPL.1): : 264 - 268
  • [8] A Case Study on Impact of Labours Sleep Deprivation in Construction Project using Application Method
    Sathvik, S.
    Krishnaraj, L.
    3RD INTERNATIONAL CONFERENCE ON ADVANCES IN MECHANICAL ENGINEERING (ICAME 2020), PTS 1-6, 2020, 912
  • [9] Risk Management Application at Performance Based Contracts Based on Project Life Cycle Using AHP Method (Case Study at Road Maintenance Project in Indonesia)
    Nurdiana, Asri
    Wibowo, Mochammad Agung
    ADVANCED SCIENCE LETTERS, 2018, 24 (12) : 9537 - 9539
  • [10] Risk analysis of time on road infrastructure development (Case study: Construction industry in Papua)
    Rusim, D. A.
    Parung, H.
    Latief, R. U.
    Tjaronge, W.
    1ST INTERNATIONAL CONFERENCE ON GLOBAL ISSUE FOR INFRASTRUCTURE, ENVIRONMENT & SOCIO-ECONOMIC DEVELOPMENT, 2019, 235