In the construction sector, proper risk management may contribute effectively to improving decision-making processes. Principals and operators (businesses and professionals) may derive benefits from reducing environmental variability and uncertainty, limiting costs due to errors and the improper use of resources and significantly improving the quality of information streams. The article illustrates the results of two studies, the first conducted in the United Arab Emirates and the second carried out in Italy, with a similar methodological approach and objectives: verifying the nature of the main risks in construction, identifying to which party (owner or contractor) responsibility for such risks is assigned in practice, representing the circumstances in which responsibility is to be considered shared and emphasising the risks with the greatest probability of occurrence. The classification of identified risks al-lows principals not so much to prevent occurrences that may have impacts on a project as to limit and contain the events (risk reduction), partly through constant monitoring and control of activities, which is the most important critical factor to success.
引用
下载
收藏
页码:100 / 108
页数:9
相关论文
共 50 条
  • [1] Study on Risk Allocationand Management Performance Measurement of Construction Project
    YilinYin
    Li, Pengjuan
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING III, PT 1, 2014, 638-640 : 2346 - 2350
  • [2] Study of dependencies in a risk management process: case of a construction project
    Lmoussaoui, Hafida
    Jamouli, Hicham
    PROCEEDINGS OF 2014 2ND IEEE INTERNATIONAL CONFERENCE ON LOGISTICS AND OPERATIONS MANAGEMENT (GOL 2014), 2014, : 112 - 117
  • [3] A project buffer and resource management model in energy sector; a case study in construction of a wind farm project
    Zohrehvandi, Shakib
    Vanhoucke, Mario
    Khalilzadeh, Mohammad
    INTERNATIONAL JOURNAL OF ENERGY SECTOR MANAGEMENT, 2020, 14 (06) : 1123 - 1142
  • [4] Application of project-based change management in construction: a case study
    Chen, Chun-Sung
    Tsui, Yu-Kun
    Dzeng, Ren-Jye
    Wang, Wei-Chih
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2015, 21 (01) : 107 - 118
  • [5] Evaluation of the impact of risk management on project performance in small construction firms in South Africa The case study of construction systems
    Amoah, Christopher
    Pretorius, Leon
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2019, 18 (03) : 611 - 634
  • [6] Applying Risk Management Workshop for a Public Construction Project: Case Study
    Goh, Cheng Siew
    Abdul-Rahman, Hamzah
    Samad, Zulkiflee Abdul
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (05) : 572 - 580
  • [7] Review on construction risk and development of risk management procedural index - A case study from Chennai construction sector
    Kumar, K. Sharan
    Narayanan, R. M.
    MATERIALS TODAY-PROCEEDINGS, 2021, 43 : 1141 - 1146
  • [8] The Study on Risk Culture Management in Construction Project
    Zhang, Xiao-Bing
    Zhang, Xiao-Fu
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1712 - 1715
  • [9] Application of risk management plan to technical risks in metro construction: Case study of the Grand Paris Express project
    Zhang, Yi
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 147
  • [10] Project risk time management - a proposed model and a case study in the construction industry
    Gladysz, Barbara
    Skorupka, Dariusz
    Kuchta, Dorota
    Duchaczek, Artur
    CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERIS/PROJMAN / HCIST 2015, 2015, 64 : 24 - 31