An application of WASPAS method in risk qualitative analysis: a case study of a road construction project in Iran

被引:41
|
作者
Badalpur, Mohammadreza [1 ]
Nurbakhsh, Ehsan [2 ]
机构
[1] Azad Univ, Tehran South Branch, Tehran, Iran
[2] Azad Univ, Tehran North Branch, Tehran, Iran
关键词
Risk assessment; risk qualitative analysis; road construction project; WASPAS method; FUZZY AHP; MANAGEMENT; SELECTION; PRICE; MODEL;
D O I
10.1080/15623599.2019.1595354
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Today, the focus on risks and uncertain events is one of the essential goals of any organization. If hazards are not taken into consideration at the planning stage it could be dangerous during project life cycle. Therefore, risk assessment is so important which has been extensively investigated by many researchers in recent years. This research suggested a method based on a combination of two WSM models (weighted sum model) and WPM (weighted product model), known as the weighted aggregated sum product assessment (WASPAS) method which was employed to assess negative effects of risks on project. This method has capability and more accuracy compared to independent methods in alternatives ranking. The WASPAS method is one of the new multi-index decision-making techniques which has been adopted and employed in many areas. In this research, we identified and evaluated the risks of a road construction project in Iran which the results showed inaccessibility/inappropriate of barrow pits, loss of key manpower during project life cycle, employing inexperienced subcontractors are of the most important risks among identified risks. Also this paper suggested the WASPAS method as a suitable method with more accuracy among MCDM techniques for evaluating of risks in a real situation.
引用
收藏
页码:910 / 918
页数:9
相关论文
共 50 条
  • [31] Application of project-based change management in construction: a case study
    Chen, Chun-Sung
    Tsui, Yu-Kun
    Dzeng, Ren-Jye
    Wang, Wei-Chih
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2015, 21 (01) : 107 - 118
  • [32] Risk analysis on implementation of road maintenance project with STEPLE method in Badung, Bali
    Adnyana, Ida Bagus Rai
    Sudarsana, Dewa Ketut
    INTERNATIONAL CONFERENCE ON ADVANCES IN CIVIL AND ENVIRONMENTAL ENGINEERING (ICANCEE 2018), 2019, 276
  • [33] Application of risk mapping to construction project jobsites
    Gambatese, JA
    Stewart, PJ
    IMPLEMENTATION OF SAFETY AND HEALTH ON CONSTRUCTION SITES, 1999, : 785 - 792
  • [34] Application of Project Information Portal in Construction Project: Case Study on Jean Workshop Project of Cone Denim
    Zhao Jie
    ICICTA: 2009 SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL IV, PROCEEDINGS, 2009, : 368 - 371
  • [35] Quality Costs in Construction: Case of Qom Monorail Project in Iran
    Jafari, Amirhosein
    Love, Peter E. D.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (09) : 1244 - 1249
  • [36] "Need for Speed": framework for measuring construction project pace - case of road project
    Zidane, Youcef J-T.
    Andersen, Bjorn
    Johansen, Agnar
    Ahmad, Saad
    PROCEEDINGS OF THE 29TH IPMA WORLD CONGRESS WC2015, 2016, 226 : 12 - 19
  • [37] An integrated of fuzzy-WASPAS and E-FMEA methods for environmental risk assessment: a case study of petrochemical industry, Iran
    Ebadzadeh, Farkhondeh
    Monavari, Seyed Masoud
    Jozi, Seyed Ali
    Robati, Maryam
    Rahimi, Razieh
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2023, 30 (14) : 40315 - 40326
  • [38] Applying Risk Management Workshop for a Public Construction Project: Case Study
    Goh, Cheng Siew
    Abdul-Rahman, Hamzah
    Samad, Zulkiflee Abdul
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (05) : 572 - 580
  • [39] Application of risk management plan to technical risks in metro construction: Case study of the Grand Paris Express project
    Zhang, Yi
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 147
  • [40] Study on Application of ABCM to Construction Project
    Yang Jianyun
    PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, 2011, : 594 - 598