共 50 条
- [11] Determinants of road construction project delay in the case of Woliso-Ambo road construction SCIENTIFIC REPORTS, 2025, 15 (01):
- [13] Study of dependencies in a risk management process: case of a construction project PROCEEDINGS OF 2014 2ND IEEE INTERNATIONAL CONFERENCE ON LOGISTICS AND OPERATIONS MANAGEMENT (GOL 2014), 2014, : 112 - 117
- [14] Construction site risk analysis based on Sbannon entropy: a case study application SAFETY AND SECURITY ENGINEERING, 2005, 82 : 171 - 181
- [15] The Application of Fuzzy Synthesis Evaluation Method Based on The Analysis Network Process in Construction Project Risk Evaluation EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1936 - +
- [16] Qualitative Risk Assessments in Project Management in Construction Industry VI INTERNATIONAL SCIENTIFIC CONFERENCE INTEGRATION, PARTNERSHIP AND INNOVATION IN CONSTRUCTION SCIENCE AND EDUCATION (IPICSE-2018), 2018, 251
- [17] Study on the Risk Analysis Method of Project Investment RECENT ADVANCE IN STATISTICS APPLICATION AND RELATED AREAS, PTS 1 AND 2, 2011, : 329 - 333
- [18] Economic Project Risk Assessment in Remediation Projects Prior to Construction: Methodology Development and Case Study Application REMEDIATION-THE JOURNAL OF ENVIRONMENTAL CLEANUP COSTS TECHNOLOGIES & TECHNIQUES, 2015, 25 (02): : 117 - 138
- [19] A qualitative study into trust in construction project teams PROCEEDINGS OF CRIOCM 2007 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2007, : 437 - 450
- [20] Application of factor analysis in risk evaluation of basketball arena project construction Computer Modelling and New Technologies, 2014, 18 (11): : 616 - 620