An application of WASPAS method in risk qualitative analysis: a case study of a road construction project in Iran

被引:41
|
作者
Badalpur, Mohammadreza [1 ]
Nurbakhsh, Ehsan [2 ]
机构
[1] Azad Univ, Tehran South Branch, Tehran, Iran
[2] Azad Univ, Tehran North Branch, Tehran, Iran
关键词
Risk assessment; risk qualitative analysis; road construction project; WASPAS method; FUZZY AHP; MANAGEMENT; SELECTION; PRICE; MODEL;
D O I
10.1080/15623599.2019.1595354
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Today, the focus on risks and uncertain events is one of the essential goals of any organization. If hazards are not taken into consideration at the planning stage it could be dangerous during project life cycle. Therefore, risk assessment is so important which has been extensively investigated by many researchers in recent years. This research suggested a method based on a combination of two WSM models (weighted sum model) and WPM (weighted product model), known as the weighted aggregated sum product assessment (WASPAS) method which was employed to assess negative effects of risks on project. This method has capability and more accuracy compared to independent methods in alternatives ranking. The WASPAS method is one of the new multi-index decision-making techniques which has been adopted and employed in many areas. In this research, we identified and evaluated the risks of a road construction project in Iran which the results showed inaccessibility/inappropriate of barrow pits, loss of key manpower during project life cycle, employing inexperienced subcontractors are of the most important risks among identified risks. Also this paper suggested the WASPAS method as a suitable method with more accuracy among MCDM techniques for evaluating of risks in a real situation.
引用
收藏
页码:910 / 918
页数:9
相关论文
共 50 条
  • [11] Determinants of road construction project delay in the case of Woliso-Ambo road construction
    Berta, Kalkidan Kefale
    Tesfaye, Mesfin
    SCIENTIFIC REPORTS, 2025, 15 (01):
  • [12] Barriers to sustainable construction project management: the case of Iran
    Fathalizadeh, Ali
    Hosseini, M. Reza
    Vaezzadeh, Seyyed Saeed
    Edwards, David J.
    Martek, Igor
    Shooshtarian, Salman
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2022, 11 (03) : 717 - 739
  • [13] Study of dependencies in a risk management process: case of a construction project
    Lmoussaoui, Hafida
    Jamouli, Hicham
    PROCEEDINGS OF 2014 2ND IEEE INTERNATIONAL CONFERENCE ON LOGISTICS AND OPERATIONS MANAGEMENT (GOL 2014), 2014, : 112 - 117
  • [14] Construction site risk analysis based on Sbannon entropy: a case study application
    Balocco, C
    Capone, P
    SAFETY AND SECURITY ENGINEERING, 2005, 82 : 171 - 181
  • [15] The Application of Fuzzy Synthesis Evaluation Method Based on The Analysis Network Process in Construction Project Risk Evaluation
    Yang Kaiyun
    Nie Qingpeng
    Zhang Ruiling
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1936 - +
  • [16] Qualitative Risk Assessments in Project Management in Construction Industry
    Burkov, Vladimir
    Burkova, Irina
    Barkhi, Reza
    Berlinov, Mikhail
    VI INTERNATIONAL SCIENTIFIC CONFERENCE INTEGRATION, PARTNERSHIP AND INNOVATION IN CONSTRUCTION SCIENCE AND EDUCATION (IPICSE-2018), 2018, 251
  • [17] Study on the Risk Analysis Method of Project Investment
    Wang Bingjie
    Zhang Lei
    RECENT ADVANCE IN STATISTICS APPLICATION AND RELATED AREAS, PTS 1 AND 2, 2011, : 329 - 333
  • [18] Economic Project Risk Assessment in Remediation Projects Prior to Construction: Methodology Development and Case Study Application
    Brinkhoff, Petra
    Norin, Malin
    Norrman, Jenny
    Rosen, Lars
    Ek, Kristine
    REMEDIATION-THE JOURNAL OF ENVIRONMENTAL CLEANUP COSTS TECHNOLOGIES & TECHNIQUES, 2015, 25 (02): : 117 - 138
  • [19] A qualitative study into trust in construction project teams
    Ong, Eric M. S.
    Zou, Patrick X. W.
    McGeorge, Denny
    PROCEEDINGS OF CRIOCM 2007 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2007, : 437 - 450
  • [20] Application of factor analysis in risk evaluation of basketball arena project construction
    Hu, Ronghui
    Computer Modelling and New Technologies, 2014, 18 (11): : 616 - 620